My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Cost of the Work--See paragraph 11.01.A 26. Liens--Charges, security interests, or <br /> for definition. encumbrances upon Project funds, real property, or <br /> personal property. <br /> 17. Drawings--That part of the Contract <br /> Documents prepared or approved by ENGINEER 27. Milestone--A principal event specified in <br /> which graphically shows the scope, extent, and the Contract Documents relating to an intermediate <br /> character of the Work to be performed by completion date Or time prior to Substantial Comple- <br /> CONTRACTOR. Shop Drawings and other tion of all the Work. <br /> CONTRACTOR submittals are not Drawings as so <br /> defined. 28. Notice of Award--The written notice by <br /> OWNER to the apparent successful bidder stating that <br /> 18. Effective Date of the Agreement—The upon timely compliance by the apparent successful <br /> date indicated in the Agreement on which it becomes bidder with the conditions precedent listed therein, <br /> effective, but if no such date is indicated, it means the OWNER will sign and deliver the Agreement. <br /> date on which the Agreement is signed and delivered <br /> by the last of the two parties to sign and deliver. 29. Notice to Proceed—A written notice given <br /> by OWNER to CONTRACTOR fixing the date on <br /> 19. ENGINEER—The individual or entity which the Contract Times will commence to run and <br /> named as such in the Agreement. on which CONTRACTOR shall start to perform the <br /> Work under the Contract Documents. <br /> 20 ENGINEERs Consultant AR individual-o <br /> entity having—a_ contra6t—wi+h ENGINEER to fUFRish 30. OWNER--The individual, entity, public <br /> seP�iGes as CNGINEER's independent Fefessienal body, or authority with whom CONTRACTOR has � <br /> entered into the Agreement and for whom the Work is <br /> who as SUGh iR the Supple^,^^ta to be performed. <br /> Cend;dons. <br /> 31. Partial Utilization--Use by OWNER of a <br /> 21. Field Order—A written order issued by substantially completed part of the Work for the pur- <br /> ENGINEER which requires minor changes in the pose for which it is intended (or a related purpose) <br /> Work but which does not involve a change in the prior to Substantial Completion of all the Work. <br /> Contract Price or the Contract Times. <br /> 32. PCBs—Polychlorinated biphenyls. <br /> 22. General Requirements—Sections of <br /> Division 1 of the Specifications. The General 33. Petroleum--Petroleum, including crude oil <br /> Requirements pertain to all sections of the Specifica- or any fraction thereof which is liquid at standard <br /> tions. conditions of temperature and pressure (60 degrees <br /> Fahrenheit and 14.7 pounds per square inch <br /> 23. Hazardous Environmental Condition—The absolute), such as oil, petroleum, fuel oil, oil sludge, oil <br /> presence at the Site of Asbestos, PCBs, Petroleum, refuse, gasoline, kerosene, and oil mixed with other <br /> Hazardous Waste, or Radioactive Material in such non-Hazardous Waste and crude oils. <br /> quantities or circumstances that may present a <br /> substantial danger to persons or property exposed 34. Project—The total construction of which _ <br /> thereto in connection with the Work. the Work to be performed under the Contract <br /> Documents may be the whole, or a part as may be <br /> 24. Hazardous Waste—The term Hazardous indicated elsewhere in the Contract Documents. <br /> Waste shall have the meaning provided in Section <br /> 1004 of the Solid Waste Disposal Act (42 USC 35. Project Manual--The bound documentary <br /> Section 6903)as amended from time to time. information prepared for bidding and constructing the <br /> Work. A listing of the contents of the Project Manual, <br /> 25. Laws and Regulations; Laws or Regulat- which may be bound in one or more volumes, is <br /> ions—Any and all applicable laws, rules, regulations, contained in the table(s)of contents. <br /> ordinances, codes, and orders of any and all govern- <br /> mental bodies, agencies, authorities, and courts 36. Radioactive Materia!—Source, special i <br /> having jurisdiction. nuclear, or byproduct material as defined by the <br /> Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> seq.)as amended from time to time. <br /> 00700-General CondRions REV 5-10-13 <br /> 00700-6 <br /> F'\Public Works\ENGINEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)\Admimlbid documents\LAP DocumentsWaster Contrail ' <br /> Documents\00700-General Conditions REV 5-10-13.doc I <br /> t <br /> li <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.