Laserfiche WebLink
data furnished to OWNER or ENGINEER by the be made in the Contract Price or Contract <br /> owners of such Underground Facilities, including Times, or both, to the extent that they are <br /> OWNER, or by others. Unless it is otherwise attributable to the existence or location of any <br /> expressly provided in the Supplementary Conditions: Underground Facility that was not shown or <br /> indicated or not shown or indicated with <br /> 1. OWNER and ENGINEER shall not reasonable accuracy in the Contract <br /> be responsible for the accuracy or com- Documents and that CONTRACTOR did not <br /> pleteness of any such information or data; and know of and could not reasonably have been <br /> expected to be aware of or to have anticipated. <br /> 2. the cost of all of the following will be If OWNER and CONTRACTOR are unable to <br /> included in the Contract Price, and CONTRAC- agree on entitlement to or on the amount or <br /> TOR shall have full responsibility for: extent, if any, of any such adjustment in <br /> Contract Price or Contract Times, OWNER or <br /> a. reviewing and checking all such CONTRACTOR may make a Claim therefor as <br /> information and data, provided in paragraph 10.05. <br /> b. locating all Underground Facilities 4.05 Reference Points <br /> shown or indicated in the Contract <br /> Documents, A. OWNER shall provide engineering surveys to <br /> establish reference points for construction which in <br /> c. coordination of the Work with the ENGINEER's judgment are necessary to enable <br /> owners of such Underground Facilities, CONTRACTOR to proceed with the Work. CON- <br /> including OWNER, during construction, and TRACTOR shall be responsible for laying out the <br /> Work, shall protect and preserve the established <br /> d. the safety and protection of all such reference points and property monuments, and shall <br /> Underground Facilities and repairing any make no changes or relocations without the prior <br /> damage thereto resulting from the Work. written approval of OWNER. CONTRACTOR shall <br /> report to ENGINEER whenever any reference point or <br /> B. Not Shown or Indicated property monument is lost or destroyed or requires <br /> relocation because of necessary changes in grades or <br /> 1. If an Underground Facility is locations, and shall be responsible for the accurate <br /> uncovered or revealed at or contiguous to the replacement or relocation of such reference points or <br /> Site which was not shown or indicated, or not property monuments by professionally qualified <br /> shown or indicated with reasonable accuracy in personnel. <br /> the Contract Documents, CONTRACTOR shall, <br /> promptly after becoming aware thereof and 4.06 Hazardous Environmental Condition at Site <br /> before further disturbing conditions affected <br /> thereby or performing any Work in connection A. Reports and Drawings: Reference is made to <br /> therewith (except in an emergency as required the Supplementary Conditions for the identification of <br /> by paragraph 6.16.A), identify the owner of those reports and drawings relating to a Hazardous <br /> such Underground Facility and give written Environmental Condition identified at the Site, if any, <br /> notice to that owner and to OWNER and ENGI- that have been utilized by the ENGINEER in the <br /> NEER. ENGINEER will promptly review the preparation of the Contract Documents. <br /> Underground Facility and determine the extent, <br /> if any, to which a change is required in the B. Limited Reliance by CONTRACTOR on <br /> Contract Documents to reflect and document Technical Data Authorized: CONTRACTOR may rely <br /> the consequences of the existence or location upon the general accuracy of the "technical data" <br /> of the Underground Facility. During such time, contained in such reports and drawings, but such <br /> CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents. <br /> safety and protection of such Underground Such "technical data" is identified in the <br /> Facility. Supplementary Conditions. Except for such reliance <br /> on such "technical data," CONTRACTOR may not rely <br /> 2. If ENGINEER concludes that a upon or make any Claim against OWNER, <br /> change in the Contract Documents is required, ENGINEER or any of ENGINEER's Consultants with <br /> a Work Change Directive or a Change Order respect to: <br /> will be issued to reflect and document such <br /> consequences. An equitable adjustment shall <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-13 <br /> R\Public Works\ENGINEERING DIVISION PROJECTSM49_8th St Sidewalk Improvements(58th Ave to 21st Court)Wdmim\bid documents\LAP Documents\Master Contract <br /> Doamnents\00700-General Conditions REV 5-10-13.doc <br />