Laserfiche WebLink
Change Order or when a Claim for an adjustment in advice of ENGINEER, which bids, if any, will be <br /> Contract Price is determined on the basis of Cost of acceptable. If any subcontract provides that the <br /> the Work, the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost <br /> CONTRACTOR will be only those additional or of the Work plus a fee, the Subcontractor's <br /> incremental costs required because of the change in Cost of the Work and fee shall be determined <br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR's Cost <br /> Claim. Except as otherwise may be agreed to in of the Work and fee as provided in this para- <br /> writing by OWNER, such costs shall be in amounts no graph 11.01. <br /> higher than those prevailing in the locality of the <br /> Project, shall include only the following items, and 4. Costs of special consultants <br /> shall not include any of the costs itemized in para- (including but not limited to engineers, <br /> graph 11.01.13. architects, testing laboratories, surveyors, <br /> attorneys, and accountants) employed for <br /> 1. Payroll GGsts for employees inn Ithe services specifically related to the Work. <br /> diFeGt employ of CONTRACTOR in the peFfor <br /> 5. Supplemental costs including the <br /> OWNERGlassifloatiORs agreed UPGR big of}d following: <br /> without limitatieR superintendents, fGlFemeR, a. The proportion of necessary trans- <br /> Ioyed full time at the portation, travel, and subsistence expenses of <br /> CONTRACTOR's employees incurred in dis- <br /> full time n_h_%1P_k shall he ;pperfiened on charge of duties connected with the Work. <br /> the basis of their—time—spent on theme <br /> Payroll GG6t6 shall 61113lude, but not be the <br /> te, b. Cost, including transportation and <br /> gra <br /> salaries , wages pas the GGSt Gf fringe maintenance, of all materials, supplies, equip- <br /> benefits, <br /> I sesur+ty ment, machinery, appliances, office, and <br /> d temporary facilities at the Site, and hand tools <br /> payroll not owned by the workers,which are consumed <br /> and refire-rneRt benefits, bonuses, sick leave, in the performance of the Work, and cost, less <br /> market value, of such items used but not con- <br /> sumed which remain the property of CON- <br /> TRACTOR. <br /> legal <br /> shall be inGlyded on the above to <br /> +? extent authorized ized by nlnr1NE-7. C. Rentals of all construction equip- <br /> ment and machinery, and the parts thereof <br /> 2. Cost of all materials and equipment whether rented from CONTRACTOR or others <br /> furnished and incorporated in the Work, includ- in accordance with rental agreements approved <br /> ing costs of transportation and storage thereof, by OWNER with the advice of ENGINEER, and <br /> and Suppliers' field services required in the costs of transportation, loading, unloading, <br /> connection therewith. All cash discounts shall assembly, dismantling, and removal thereof. <br /> accrue to CONTRACTOR unless OWNER All such costs shall be in accordance with the <br /> deposits funds with CONTRACTOR with which terms of said rental agreements. The rental of <br /> to make payments, in which case the cash any such equipment, machinery, or parts shall <br /> discounts shall accrue to OWNER. All trade cease when the use thereof is no longer <br /> discounts, rebates and refunds and returns necessary for the Work. <br /> from sale of surplus materials and equipment <br /> shall accrue to OWNER, and CONTRACTOR d. Sales, consumer, use, and other <br /> shall make provisions so that they may be similar taxes related to the Work, and for which <br /> obtained. CONTRACTOR is liable, imposed by Laws and <br /> Regulations. <br /> 3. Payments made by CONTRACTOR <br /> to Subcontractors for Work performed by e. Deposits lost for causes other than <br /> Subcontractors. If required by OWNER, CON- negligence of CONTRACTOR, any Sub- <br /> TRACTOR shall obtain competitive bids from contractor, or anyone directly or indirectly <br /> subcontractors acceptable to OWNER and employed by any of them or for whose acts any <br /> CONTRACTOR and shall deliver such bids to of them may be liable, and royalty payments <br /> OWNER, who will then determine, with the and fees for permits and licenses. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-32 <br /> F:1Public Works\ENGINEERING DIVISION PROJECTSXID49_8th St Sidewalk Improvements(58th Ave to 21st CDurt)\Admim\bid documentstlAP Documentswaster Contract <br /> DocumentsM700-General Conditions REV 5-10-13.doc <br />