My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-6.08 Permits <br /> SC-6.08 Add the following paragraphs immediately after paragraph GC-6.08.A: <br /> 1. The OWNER has obtained the following permits: SJRWMD has determined the <br /> project is exempt from their permitting process (See Appendix E). No other <br /> permits are necessary. <br /> 2. The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses. The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> 3. The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements. The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with. <br /> SC-11.01 Cost of the Work <br /> SC-11.01.A.1. Delete paragraph GC-11.01.A.1 in its entirety, and insert the following sentences <br /> in its place: <br /> 1. CONTRACTOR will receive payment for actual costs of direct labor and burden <br /> (see SC-2.06.13) for the additional or unforeseen work. Labor includes foremen <br /> actually engaged in the work; and will not include project supervisory personnel nor <br /> necessary on-site clerical staff, except when the additional or unforeseen work is a <br /> controlling work item and the performance of such controlling work item actually <br /> extends completion of the project due to no fault of the Contractor. Compensation <br /> for project supervisory personnel, but in no case higher than a Project Manager's <br /> position, shall only be for the pro-rata time such supervisory personnel spent on <br /> the contract. In no case shall an officer or director of the Company, nor those <br /> persons who own more than 1% of the Company, be considered as project <br /> supervisory personnel, direct labor or foremen hereunder. The expenses of <br /> performing Work outside of regular working hours, on Saturday, Sunday, or legal <br /> holidays, shall be included in the above to the extent authorized by OWNER. <br /> SC-13.03 Test and Inspections <br /> SC-13.03.B. Delete paragraph GC-13.03.8 in its entirety, and insert the following sentences in <br /> its place: <br /> B. OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections, tests, or approvals required by the Contract Documents <br /> except those inspections, tests, or approvals listed immediately below. Subsequent <br /> inspections, tests, or approvals required after initial failing inspections, tests, or <br /> approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br /> applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br /> following inspections, tests, or approvals: <br /> 1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br /> below; <br /> 2. costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13.04.6 shall be paid as provided in said paragraph 13.04.13; <br /> 00800-7 <br /> 00800-Supplementary Conditions 05-13 rev <br /> 00800 7FAPubllc Works\ENGINEERING DIVISION PROJECTS\1049 8th Sl Sidewalk Improvements(58th Ave to 21st Court)V\dmim\bid documents\LAP DocumentsWaster <br /> Contract Documents\00800-Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.