Laserfiche WebLink
SECTION 00948 -Work Change Directive <br /> No. <br /> DATE OF ISSUANCE: EFFECTIVE DATE: <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Project: 8T" STREET SIDEWALK IMPROVEMENTS FROM 58T" AVENUE TO 21ST COURT <br /> OWNER's Contract No. 1049 <br /> Bid No. 2017009 <br /> FM No. 431733-1-58-01 <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Purpose of Work Change Directive: <br /> Attachments: (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices Contract Times <br /> II Unit Prices ❑Contractor's Records <br /> ❑Lump Sum II Engineer's Records <br /> Other: n Other: <br /> II By Change Order: L1 By Change Order: <br /> Estimated increase (decrease) of this Work Estimated increase(decrease) in Contract Times: <br /> Change Directive <br /> � Substantial Completion: days; <br /> Ready for Final Completion: days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: APPROVED: <br /> By: By. By. <br /> CONTRACTOR (Signature) <br /> ENGINEER (Signature) OWNER (Signature) <br /> Date: Date: Date: <br /> * * END OF SECTION * * 00948-Work Change Directive Rev 06-2013.doc <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1049_8th St Sidewalk Improvements(58th Ave to 21st Court)\Admim\bid <br /> documents\LAP Documents\Master Contract Documents\00948-Work Change Directive Rev 06-2013.doc <br />