My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> I <br /> SECTION 01630 <br /> SUBSTITUTIONS <br /> I <br /> 1 <br /> 1.1 GENERAL <br /> A. Requests for review of a substitution shall conform to the requirements of <br /> Article 6.05, "Substitutes and Or-Equals," of the General Conditions, and shall <br /> contain complete data substantiating compliance of the proposed substitution <br /> with the Contract Documents. <br /> 1.2 CONTRACTOR'S OPTIONS i <br /> A. For materials or equipment (hereinafter products) specified only by reference <br /> standard, select product meeting that standard by any manufacturer, fabricator, <br /> supplier or distributor (hereinafter manufacturer). To the maximum extent <br /> possible, provide products of the same generic kind from a single source. <br /> B. For products specified by naming several products or manufacturers, select any <br /> one of the products or manufacturers named which complies with Specifications. <br /> C. For products specified by naming one or more products or manufacturers and <br /> I <br /> stating "or equivalent," submit a request for a substitution for any product or <br /> manufacturer which is not specifically named. <br /> D. For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted, there is no option and no <br /> substitution will be allowed. <br /> E. Where more than one choice is available as a CONTRACTOR's option, select <br /> product which is compatible with other products already selected or specified. <br /> 1.3 SUBSTITUTIONS <br /> A. During a period of 15 days after date of commencement of Contract Time, <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of �. <br /> products or manufacturers, and construction methods (if specified). <br /> 1. After end of specified period, requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR. ' <br /> B. Submit 5 copies of Request for Substitution. Submit a separate request for each <br /> substitution. In addition to requirements set forth in Article 6.05 of General <br /> Conditions, include in the request the following: j <br /> 1. For products or manufacturers: <br /> a. Product identification, including manufacturer's name and address. <br /> b. Manufacturer's literature with product description, performance and <br /> test data, and reference standards. <br /> 01630-1 01630 Substitutions <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1049 8th St Sidewalk Improvements (58th Ave to 21st Court)\Admim\bid <br /> documents\LAP Documents\Master Contract Documents\01630-Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.