My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-188A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-188A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:35:28 AM
Creation date
12/1/2016 11:33:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2016
Control Number
2016-188A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting Inc.
Subject
Contract & specifications
8th St. Sidewalk Improvements
Area
58th Ave. to 21st Ct.
Project Number
1049
Bid Number
2017009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br /> Post Final Inspection <br /> 1.1 GENERAL <br /> A. Approximately one year after Final Completion, the OWNER will make <br /> arrangements with the Construction Coordination Manager and the <br /> CONTRACTOR for a post final inspection and will send a written notice to said <br /> parties to inform them of the date and time of the inspection. <br /> B. Corrections of defective work noted by OWNER and Construction Coordination <br /> Manager shall comply with the applicable sections of Article 13, General <br /> Conditions. <br /> C. After the inspection, the OWNER will inform the CONTRACTOR of any <br /> corrections required to release the performance and payment bonds. <br /> 001820-Post Final Inspection rev 05-13 <br /> 001820-1 <br /> F:1Public WorksXENGINEERING DIVISION PROJECTSN049_6th St Sidewalk Improvements(58th Ave to 21st Court)WdmimWd documents\LAP DocumentsWaster Contract <br /> Doaiments\001820-Post Final Inspection rev 05-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.