Laserfiche WebLink
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and Timothy Rose Contracting, Inc. <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 - WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> The project will consist of the construction of a 5' wide concrete sidewalk and minor <br /> drainage modifications along the north side of 8th Street between 58th Avenue and 211t <br /> Court, a length of approximately 2.35 miles. <br /> ARTICLE 2 - THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: 8T" STREET SIDEWALK IMPROVEMENTS FROM 58T" <br /> AVENUE TO 21ST COURT <br /> County Project Number: 1049 <br /> FM Number: 431733-1-58-01 <br /> Bid Number: 2017009 <br /> Project Address: 8th Street from 58th Avenue to 21s' Court, Vero Beach, <br /> Florida 32960 <br /> ARTICLE 3 — ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 150th calendar day after the <br /> date when the Contract Times commence to run as provided in paragraph 2.03 of the <br /> 00520-Agreement(Public Works)FOR LAP PROJECTS ONLY <br /> 00520-2 <br /> F.\Purchasing\Bids\2016-2017 FY(2017000)\2017009 8th Street Sidewalk(58th Ave to 21st Cl)\00520-Agreement(Public Works)FOR LAP PROJECTS ONLY.dcc <br />