My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/21/1992
CBCC
>
Meetings
>
1990's
>
1992
>
7/21/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:32 PM
Creation date
6/16/2015 11:07:48 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/21/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Scurlock asked whether any of the damage to 37th <br />Street was due to construction on Indian River Boulevard, and <br />Director Davis assured the Board that 37th Street needed repair <br />even before construction commenced on Indian River Boulevard. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the above -listed resurfacing/widening projects, as <br />recommended by staff. <br />CHANGE ORDER NO. 9104-1 - WABASSO HIGH LEVEL BRIDGE REPAIRS <br />The Board reviewed memo from Public Works Director Jim Davis <br />dated July 13, 1992: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., <br />Public Works Director <br />SUBJECT: CHANGE ORDER NO. 9104-1 <br />Wabasso High Level Bridge Repairs - <br />DPW Project 9104 <br />Ref. Letter: Susan H. Miles, Tom Quinn Co. Inc. to <br />James W. Davis dated July 6, 1992 <br />DATE: July 13, 1992 <br />DESCRIPTION AND CONDITIONS <br />FILE: colwbbrg.agn <br />Staff has prepared the attached Change Order which revises the <br />Scope of Work for the Wabasso Bridge Causeway project by adding <br />certain items such as epoxy injection of cracks in concrete piers <br />and deleting other items including west bulkhead replacement, <br />patching of spalls, and furnishing a bridge inspection crane. <br />The resulting Change Order decreases the contract price by <br />$68,007. <br />ALTERNATIVES AND ANALYSIS <br />At this time, staff is of the opinion that the changes are <br />desirable and that Change Order No. 9104-1 should be approved. <br />RECOMMENDATIONS AND FUNDING <br />It is recommended that Change Order No. 9104-1 which decreases <br />the contract price by $68,007 be approved. The new contract <br />amount would be $560,151. <br />23 <br />JUL BOOK ,.1 F't�,E <br />
The URL can be used to link to this page
Your browser does not support the video tag.