My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-016
CBCC
>
Ordinances
>
2010's
>
2016
>
2016-016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:43:11 PM
Creation date
12/14/2016 9:55:32 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2016-016
Adopted Date
12/06/2016
Agenda Item Number
10.A.1.
Ordinance Type
Amendment
State Filed Date
12\14\2016
Entity Name
Capital Improvements Element of the Comprehensive Plan
Subject
Amendment to text of 2030 Comprehensive Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />With the exception of public schools, the monitoring system portion of the concurrency management <br />plan is maintained by the county's planning division. Effective July 1, 2008, the School District <br />initiated and now maintains the monitoring system portion of the concurrency management plan for <br />public schools. Using a network computer system and database management software, records were <br />developed and are maintained for each specific facility. <br />Based upon information in the specific comprehensive plan elements, total capacity figures for each <br />applicable facility are maintained in database files established for each public facility category. <br />Capacity figures are modified as facilities are expanded or as criteria specified in the availability of <br />capacity section are met, thereby allowing a programmed expansion to be considered for capacity <br />determination purposes. Through contact with other county departments, planning staff are able to <br />modify capacity estimates as soon as facility characteristics are changed. <br />Table 6.17 depicts the general structure of the monitoring system database file for each public facility <br />category. That table shows that available capacity for each specific facility is a function of total <br />capacity less existing demand and less committed demand. The demand section of this concurrency <br />management plan identifies the methodology for assessing demand. <br />Table 6.17: Monitoring S stem Design <br />Public <br />Specific <br />Total Capacity <br />Existing Demand <br />Committed Demand <br />Available Capacity <br />Facility <br />Facilities <br />Category <br />Peak season/ peak <br />Annual count (average) <br />Volume estimated from <br />Traffic <br />Roadways <br />direction/ peak hour <br />(peak season/peak <br />approved Development <br />(Total Capacity) - (Existing <br />(LOS D) <br />direction/peak hour) <br />Orders (DO) <br />Demand) - (Committed Demand) <br />Sanitary <br />Treatment <br />Design flows <br />Existing flows <br />Volume estimated from <br />(Total Capacity) - (Existing <br />Sewer <br />Plants <br />approved DO's <br />Demand) - (Committed Demand) <br />Potable Water <br />Treatment <br />Design flows <br />Existing flows <br />Volume estimated from <br />(Total Capacity) - (Existing <br />Plants <br />approved DO's <br />Demand) ) - (Committed Demand) <br />Solid Waste <br />Landfill <br />Active cell design <br />Active cell volume used <br />Volume estimated from <br />(Total Capacity) - (Existing <br />capacity <br />approved DO's <br />Demand) - (Committed Demand) <br />(Acres per thousand <br />(Acres per thousand <br />Recreation <br />Parks <br />Park Acreage <br />population) X (existing <br />population) X (projected <br />(Total Capacity) - (Existing <br />population) <br />population for approved <br />Demand) - (Committed Demand) <br />DO's) <br />Drainage <br />Drainage <br />Volume <br />Existing flows <br />Volume of stonnwater <br />allowed to outfall for <br />(Total Capacity) - (Existing <br />conveyances <br />approved DO's <br />Demand) - (Committed Demand) <br />Public <br />Schools(K- <br />Permanent Student <br />Annual Enrollment <br />Students estimated from <br />approved residential <br />(Total Capacity) - (Existing <br />Education <br />12) <br />Stations (FISH) <br />Count (FTE) <br />Development Orders) <br />Demand) - (Committed Demand) <br />To implement the monitoring system, the following actions shown in table 6.18 will be necessary. <br />Community Development Department Indian River County <br />Adopted , 2016, Ordinance 2016- 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.