My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/04/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/04/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 11:10:16 AM
Creation date
12/14/2016 12:03:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/04/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dori Roy_ <br />From: Tom Gruber <tlg@copper.net> <br />Sent: Sunday, February 16, 2014 -5:22 -PM <br />Subject: Possible Railroad Presentation <br />Attachments: Application for county public discussioon.doc <br />Please find attached a E -copy of my request to address a Commission meeting. By way of <br />background, I am an electrical engineer who served the Town of Cohasset, MA as a volunteer <br />through the 3 year long EIS and _Section 106 application and hearings for the reconstruction of a 28 <br />mile commuter rail line that was constructed on a totally abandoned railroad right of way. The <br />project ended up being a hornless system and we utilized some interesting crossing designs that are <br />substantially lower cost from the talked -about "quad gates." <br />I was then _hired by the Town to act as a liaison on behalf of the Town during construction. There <br />issues as varying as "a truck ran over Mrs Smith's petunias" to incorrectly placed drain lines that <br />would not permit the required drainage. <br />I think I can offer some valuable insights to the County that may help provide a better outcome for <br />I am neither pro nor against the railroad project. But dealing with such a project is a very <br />complicated, involved and highly technical project, where desirable outcomes for the residents can <br />be nudged by taking appropriate actions. <br />If you have any questions, please contact me at 772-539-0292 or via this email address. <br />Thomas L. Gruber <br />221 F Park Shores Circle <br />Indian River Shores, Florida 32963 <br />SmeadSoft Reprint Date: Wednesday, December 14, 2016 - 11:57:28 - BCC:1826, Attachment Id 1, Page 181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.