My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
06/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:26:43 PM
Creation date
12/14/2016 1:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County 1 Impact Fee Update Study <br />as well as the mix of planned urban and rural designed roadways. Compared to other <br />jurisdictions, Indian River County plans to construct a greater proportion of rural designed <br />roadways, which are Tess expensive than roadways with urban design characteristics. <br />Table IX -3 <br />Estimated Cost per Lane Mile <br />for County and State Roadway Projects in Indian River <br />County <br />Cost Phase <br />Design <br />County <br />Roads(1) <br />$159,000 <br />State <br />Roads(2) <br />$196,000 <br />County and <br />State Roads(3) <br />$162,000 <br />Right -of -Way <br />$656,000 <br />$781,000 <br />$667,000 <br />Construction <br />$1,598,000 <br />$1,776,000 <br />$1,614,000 <br />CEI <br />$143,000 <br />$196,000 <br />$148,000 <br />Total Cost <br />Lane Mile Distribution(4) <br />$2,556,000 <br />91% <br />$2,949,000 <br />9% <br />$2,591,000 <br />100% <br />(1) Source: Table IX -1 <br />(2) Source: Table IX -2 <br />(3) Lane mile distribution (Item 4) multiplied by the design, ROW, construction, and <br />CEI phase costs by jurisdiction to develop a weighted average cost per lane mile <br />(4) Source: Appendix C, Table C-17, Items (a) and (b) <br />Capacity Added per Lane Mile <br />An additional component of the transportation impact fee equation is the capacity added <br />per lane mile (also known as the maximum service volume added per mile) of roadway <br />constructed. To calculate the vehicle miles of capacity (VMC) per lane mile of constructed <br />future roadway, an analysis of the 2035 projects (see Appendix C, Table C-17) was <br />conducted to reflect the mix of county and state road improvement that will be built in the <br />future. As shown in Table IX -4, the resulting average capacity per lane mile calculated <br />based on these projects is 8,255. <br />The updated capacity added per lane mile estimate of 8,255 is approximately three percent <br />less than the figure used in the 2004 Traffic Impact Fee Study. It should be noted that this <br />figure (8,499) was not changed as part of the 2009 update. <br />Tindale -Oliver & Associates, Inc. Indian River County <br />June 2014 113 Impact Fee Update Study <br />048 <br />
The URL can be used to link to this page
Your browser does not support the video tag.