Laserfiche WebLink
Indian River County 1 Impact Fee Update Study <br />Cost Component <br />The capital costs of providing educational facilities includes three components, including the <br />school facility cost, transportation cost, and ancillary facility costs. This section addresses <br />each of these components. <br />Facility Cost per Student Station <br />The first step in determining the cost of providing public schools to Indian River County <br />residents is to calculate the facility cost per student station. Several cost components must <br />be considered when calculating the total cost of constructing a school, including <br />architectural/civil design/site improvement costs; construction costs; furniture, fixtures, and <br />equipment (FF&E) costs; and the cost to purchase the land. Each component of the school <br />facility cost is described in more detail in the following subsections. <br />Architectural/Civil Design/Site Improvement, Construction and FF&E Costs <br />To determine the administration, architect/civil design/site improvement, construction, and <br />FF&E costs associated with building a new school in Indian River County, cost information <br />was obtained for new schools built or proposed in Indian River County. The most recent <br />construction included Storm Grove Middle School (opened in 2009), and renovation and <br />expansion of the Vero Beach Elementary School (opened in 2012). In addition to these <br />schools, insurance values of the existing schools and estimates included in the Educational <br />Plant Survey for upcoming school expansions were reviewed and supplemented with <br />discussions with the District's representatives. Given the recent fluctuations in construction <br />costs and the limited number of schools built in the County over the past few years, a <br />review of schools that were built over the past five years throughout the State was <br />conducted. This database included approximately 135 schools. Of these, approximately 20 <br />were built in 2011. Based on this information, a construction cost of $145 per net square <br />foot was used in the study for elementary schools, $175 per net square foot for middle <br />schools, and $185 per net square foot for high schools, with a weighted average <br />construction cost of $165 per net square foot for all school levels. Appendix A provides <br />additional information on cost estimates. <br />The architectural, civil design, site preparation (including on-site improvement and traffic <br />control costs), and FF&E costs (including technology) are calculated based on the ratio of <br />these costs to the construction costs observed in Indian River County and other <br />jurisdictions. These figures were also discussed with the District representatives and are <br />Tindale -Oliver & Associates, Inc. Indian River County <br />June 2014 130 Impact Fee Update Study <br />