Laserfiche WebLink
Indian River County 1 Impact Fee Update Study <br />Table C-8 <br />CEI Cost Adjustment — County Roads <br />Road Type <br />Urban Design <br />Rural Design <br />Weighted CEI <br />CEI Cost per Lane Section Design <br />Mile(1) Distribution(2l Cost per Lane <br />Mile(3) <br />$162,000 <br />$134,000 <br />34% <br />66% <br />Weighted Average CEI Cost per Lane Mile <br />$55,000 <br />$88,000 <br />$143,000 <br />1) CEI cost is estimated at 9% of construction cost based on recent TIF studies in <br />Table C-16 (Item a). <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the associated section design weight <br />(Item 2) for each design type and added together. <br />State Roadways <br />The CEI cost factor for state roads was estimated as a percentage of the construction cost <br />per lane mile. This factor was determined through a review of the CEI -to -construction cost <br />ratios for state road unit costs in previously completed impact fee studies throughout <br />Florida. For state roadways, the CEI factors ranged from 8 percent to 17 percent, with a <br />weighted average of 11 percent. For purposes of this update study, the CEI cost for state <br />roads was calculated at 11 percent of the construction cost per lane mile (see Table C-16 for <br />additional information). <br />Table C-9 <br />CEI Cost Adjustment — State Roads <br />Road Type <br />Urban Design <br />Rural Design <br />CEI Cost per Lane Section Design Weighted CEI <br />Cost per Lane <br />Mile(1) Distribution(2) <br />Mile(3) <br />$220,000 <br />$183,000 <br />34% <br />66% <br />Weighted Average CEI Cost per Lane Mile <br />$75,000 <br />$121,000 <br />$196,000 <br />(1) CEI cost is estimated at 11% of construction cost based on recent TIF studies in <br />Table C-16 (Item b). <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the associated section design weight <br />(Item 2) for each design type and added together. <br />Tindale -Oliver & Associates, Inc. <br />June 2014 <br />Indian River County <br />C-7 Impact Fee Update Study <br />'Z-7-3 <br />