My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
06/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:26:43 PM
Creation date
12/14/2016 1:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County 1 Impact Fee Update Study <br />Table C-11 <br />Project # <br />05013 <br />Description <br />17th Lane SW <br />Right -of <br />From <br />27th Ave <br />-Way Factor — <br />To <br />20th Ave <br />Recent <br />Bid Year <br />2008 <br />County Road <br />Status <br />Completed <br />Improvements <br />Feature <br />2 to 3 Lanes <br />Section <br />Design <br />Urban <br />in Indian <br />Length <br />(Miles) <br />0.52 <br />River <br />Lanes <br />Added <br />1 <br />County <br />Lane <br />Miles <br />Added <br />0.52 <br />Right -of- <br />Way Cost <br />- <br />Construction <br />Costs <br />$525,000 <br />ROW/ <br />Constr. (2) <br />- <br />06026 <br />20th Ave SW <br />21st St SW <br />17th Lane SW <br />2008 <br />Completed <br />1U to 2D Lanes <br />Urban <br />0.27 <br />2 <br />0.54- <br />$1,886,715 <br />06026 <br />20th Ave SW <br />25th St SW <br />21st St SW <br />2009 <br />Completed <br />0 to 2 Lanes <br />Urban <br />0.25 <br />2 <br />0.50 <br />06047 <br />College Lane Rd <br />Extension IRSC <br />66th Ave <br />2009 <br />Completed <br />Oto 2 Lanes <br />Urban <br />0.50 <br />2 <br />1.00 <br />- <br />$1,700,000 <br />- <br />01014 <br />16th St <br />66th Ave <br />74th Ave <br />2009 <br />Completed <br />Oto 2 Lanes <br />Urban <br />1.27 <br />2 <br />2.53 <br />$664,258 <br />$3,109,321 <br />21% <br />06021 <br />66th Ave <br />16th St <br />SR 60 <br />2009 <br />Completed <br />0 to 3 Lanes <br />Urban <br />0.51 <br />3 <br />1.53 <br />$3,758,300 <br />$2,504,423 <br />150% <br />02025 <br />53rd St <br />Kings Hwy <br />Lateral H Canal <br />2010 <br />Completed <br />0 to 4 Lanes <br />Urban <br />2.04 <br />4 <br />8.14 <br />$3,221,638 <br />$7,000,000 <br />46% <br />02025 <br />53rd St <br />Lateral H Canal <br />Indian River Blvd <br />2010 <br />Completed <br />0 to 4 Lanes <br />Urban <br />0.50 <br />4 <br />2.00 <br />$1,500,000 <br />$7,605,993 <br />20% <br />06018 <br />Oslo Rd, Ph. 11 <br />43rd Ave <br />27th Ave <br />2011 <br />Completed <br />2U to 4D Lanes <br />Urban <br />1.20 <br />3 <br />3.60 <br />$4,032,257 <br />$4,531,822 <br />89% <br />05004 <br />Oslo Rd, Ph. III <br />43rd Ave <br />58th Ave <br />2012 <br />Ongoing <br />2U to 4D Lanes <br />Urban <br />1.15 <br />2 <br />2.30 <br />$245,445 <br />$3,812,202 <br />6% <br />02031 <br />66th Ave <br />4th St <br />16th St <br />2012 <br />Ongoing <br />Oto 2U/2D <br />Rural <br />1.50 <br />2/3 <br />5.50 <br />$765,946 <br />$6,628,935 <br />12% <br />06040 <br />66th Ave <br />SR 60 <br />49th St <br />2012 <br />Ongoing <br />2 to 4 Lanes <br />Urban <br />3.05 <br />2 <br />6.10 <br />$10,567,637 <br />$20,773,389 <br />51% <br />Total <br />12.75 <br />34.26 <br />$24,755,481 <br />$60,077,800 <br />41% <br />(1) Source: Indian River County <br />(2) Right-of-way costs divided by construction costs <br />Tindale -Oliver & Associates, Inc. <br />June 2014 <br />Indian River County <br />C-9 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.