My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
06/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:26:43 PM
Creation date
12/14/2016 1:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County 1 Impact Fee Update Study <br />Table F-1 <br />Correctional Facilities Building Value <br />Source <br />Construction of IRC Jail Unit 01 <br />Year <br />2008 <br />Building Cost per <br />Square Foot <br />$288 <br />Estimates fora Future Jail <br />N/A <br />N/A <br />Insurance Values of Existing Jail Buildings(2) <br />2013 <br />$140- $220 <br />Recent Jail Construction in Other Florida Counties(3) <br />2009, 2013 <br />$225 <br />Estimates from National Construction Companies(4) <br />2013 <br />$270-$300 <br />Estimates from Florida Architects(5) <br />2013 <br />$285-$445 <br />Used in the Study <br />1 <br />2013 I <br />$250 <br />(1) Source: Indian River County <br />(2) Source: Indian River County, figures rounded to nearest $10 <br />(3) Source: AJAX Engineering and Florida Department of Correctional Facilities, figures rounded to <br />nearest $10 <br />(4) Source: Reed Construction <br />(5) Based on discussions with industry architects for a range of a typical jail in Florida based on their <br />experience <br />To determine the building value of the support facilities, such as the guard house, <br />maintenance shop, etc., insurance value of the existing buildings was reviewed. This <br />analysis suggested a unit cost of $125 per square foot. <br />Emergency Services Facilities <br />As part of this analysis, TOA contacted several Florida jurisdictions to obtain more recent <br />cost information. The bids and estimates received in 2010 for facilities built in 2010 or 2012 <br />range from $190 to $300 per square foot (excluding furniture/fixture/equipment, site <br />preparation cost, permits, fees and other similar expenses). The following chart presents <br />the building construction cost trends based on bids, estimates, and other information <br />obtained during the previous impact fee studies completed by TOA. As presented, the <br />variation in station costs is relatively minor over the past few years. <br />Tindale -Oliver & Associates, Inc. Indian River County <br />June 2014 <br />F-2 Impact Fee Update Study <br />2Sk <br />
The URL can be used to link to this page
Your browser does not support the video tag.