My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/16/2014 (5)
CBCC
>
Meetings
>
2010's
>
2014
>
12/16/2014 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 3:57:45 PM
Creation date
12/19/2016 11:32:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/16/2014
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Funding Categories <br />Regular Category ($750,000) <br />1. Neighborhood Revitalization (infrastructure) <br />➢ LMI neighborhoods at least 51% LMI; 70% LMI will <br />maximize score <br />➢ Minimum 85 LMI households (HH) in the project area <br />served by the CDBG work for max score <br />➢ Eligible Activities: water, sewer, roads, storm, <br />neighborhood centers, parks, sidewalks <br />➢ New sewer and water score the highest <br />➢ Leverage up to $50,000 for 25 points <br />➢ Ready to proceed (plans, specs, permit apps) 100 points <br />Neighborhood Option: Combine West Wabasso Sewer Phase 2 <br />and Gifford Drainage Improvements (over 85 LMI houses total) <br />West Wabasso Phase 2 Sewer Service Area <br />T VI:MASS° <br />.ViFV S(W i Q SYSTTM PHASE II <br />Ali{3ti MAP <br />12/17/2014 <br />96.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.