My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
12/17/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 3:41:12 PM
Creation date
12/20/2016 11:34:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2014
Meeting Body
Town of Indian River Shores
City of Vero Beach
Subject
Mediation Meeting Electric Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br />Page 2 of 3 <br />Orlando Utilities Commission Discussion Points hi <br />Response to City of Vero Beach Request for Modification to PPA <br />October 20,2014 <br />Delivery Point for Capacity/Energy <br />Same as in PPA currently for both Base Capacity and Peaking Capacity <br />(OUC-IPL interconnection). <br />Conditions of OUC Offer <br />1) Vero to retire the Vero Power Plant upon completion ofany applicable <br />tranamisaion reliability upgrades, with the plant capacity removed from <br />the PPA as an available resource for Vero as oldie Amtaxlment <br />Effective Date. <br />2) OUC is to have a one-time option on or before 1-1-2029 lo acquire the <br />rights and obligations of Vero's St Lueie Bafflement (13.5 W) <br />based on an agreed power purchase agreement that is a cost pass, <br />through pricing. Option would sorvive OUC early termination. <br />3) anent natural gas transportation rights assig' nal to OUC would <br />remain with OUC and would survive OUC early termination. <br />4) Vero shall obtain network transmission service from FPL tbr Peaking <br />Capacity from the Delivery Point to the load. <br />5) OUC shall obtain firm transmiasion service over the OUC transmission <br />system for the Peaking Capacity to the Delivery Point <br />6) Subject to negotiation and agreement on definitive contract tams and <br />approval by the Board of OUC and the City of Vero Beach City <br />Council <br />Page 2 <br />31 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.