ATTACHMENT B <br />Page 2 of 3 <br />Orlando Utilities Commission Discussion Points hi <br />Response to City of Vero Beach Request for Modification to PPA <br />October 20,2014 <br />Delivery Point for Capacity/Energy <br />Same as in PPA currently for both Base Capacity and Peaking Capacity <br />(OUC-IPL interconnection). <br />Conditions of OUC Offer <br />1) Vero to retire the Vero Power Plant upon completion ofany applicable <br />tranamisaion reliability upgrades, with the plant capacity removed from <br />the PPA as an available resource for Vero as oldie Amtaxlment <br />Effective Date. <br />2) OUC is to have a one-time option on or before 1-1-2029 lo acquire the <br />rights and obligations of Vero's St Lueie Bafflement (13.5 W) <br />based on an agreed power purchase agreement that is a cost pass, <br />through pricing. Option would sorvive OUC early termination. <br />3) anent natural gas transportation rights assig' nal to OUC would <br />remain with OUC and would survive OUC early termination. <br />4) Vero shall obtain network transmission service from FPL tbr Peaking <br />Capacity from the Delivery Point to the load. <br />5) OUC shall obtain firm transmiasion service over the OUC transmission <br />system for the Peaking Capacity to the Delivery Point <br />6) Subject to negotiation and agreement on definitive contract tams and <br />approval by the Board of OUC and the City of Vero Beach City <br />Council <br />Page 2 <br />31 <br />• <br />