My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/20/2016
CBCC
>
Meetings
>
2010's
>
2016
>
09/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 12:08:02 PM
Creation date
12/21/2016 10:20:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/20/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUNKEhHERGER <br />engineering & testing, inc. <br />Alferracan COMPANY <br />Indian River County RFQ 2014007 - Geotechnical Annual Services Renewal <br />Continuing Geotechnical Services Fee Schedule <br />Effective September 23, 2016 to September 22, 2018 <br />Proposal No. PHB140096 <br />VI. ENGINEERING SERVICES <br />A. Technician Inspection Services <br />• Engineering Technician $55.00/hour <br />• Senior Engineering Technician/Inspectot $60.00/hour <br />B. Certified Building (Concrete/Steel) Inspection Services $75.00/hour <br />C. Clerical/Word Processing $50.00/hour <br />D. Computer Graphics $55.00/hour <br />E. Environmental Technician $75.00/hour <br />F. Staff Engineer $90.00/hour <br />G. Project Engineer $95.00/hour <br />H. Registered Professional Engineer $135.00/hour <br />I. Principal Engineer $175.00/hour <br />[Expert Witness, Consultation and <br />Other Specialty Engineering Work] <br />Notes: <br />1. Hourly rates are portal-to-portal. <br />2. An overtime factor of 1.5 will be applied to the attached rates for work performed on <br />weekends, holidays, and outside the regular work week (7:30 a.m. to 5:00 p.m. Monday <br />through Friday). <br />3. These fees do not include costs for maintenance -of -traffic (MOT) and/or utility locations <br />which may be required for certain jobs. These costs will be negotiated on an as -needed, <br />;case-by-case basis. <br />4. The Field Exploratory Work costs are for land-based work using truck -mounted drilling <br />equipment only. Sites requiring all -terrain drilling equipment, clearing, and water-based <br />work will be quoted on a site specific basis. <br />5. Third party charges and other out-of-pocket expenses will be billed at cost plus 15%. <br />Submitted By: 4r � " I - " 111 ---'- Date: September 13, 2016 <br />David T. <br />Office M <br />97 <br />607 NW Commodity Cove, Port St. Lucie, Florida 34986 • Phone (772) 343-9787 • Fax (772) 343-9404 <br />n--- c -CIC <br />
The URL can be used to link to this page
Your browser does not support the video tag.