My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/20/2016
CBCC
>
Meetings
>
2010's
>
2016
>
09/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 12:08:02 PM
Creation date
12/21/2016 10:20:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/20/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason Brown; County Administrator <br />DEPARTMENT HEAD CONCURRENCE: <br />Stan Boling, AI P; ommunity Development Director <br />FROM: John W. McCoy, AICP; Chief, Current Development <br />DATE: September 2, 2016 <br />SUBJECT: SLV Millstone, LLC's Request for Final Plat Approval for Millstone Landing PD <br />Phases 4, 5, and 6 [PD -04-04-08 / 2003100068-76768] <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of September 20, 2016. <br />DESCRIPTION, BACKGROUND & CONDITIONS: <br />The Millstone Landing PD Phases 4, 5, and 6 represent the remaining phases of the Millstone Landing <br />PD. Phases 4, 5, and 6 consist of 243 lots on 97.34 acres resulting in a density of 2.50 units/acre. <br />Located on south side of 17th Street SW west of'27th Avenue SW, the overall Millstone Landing PD <br />project is proposed to be developed in 6 phases, is zoned RS -3 (Residential Single -Family up to 3 <br />units/acre), and has an L-1 (Low Density 1 up to 3 units/acre) land use designation. Phases 1, 2, and 3 <br />are located between 17th Street SW and 21" Street SW and have been significantly developed with <br />single-family homes. Phases 4, 5, and 6 are located south of 21" Street SW. The density for the <br />overall Millstone Landing PD project is 2.27 units per acre. <br />There is a developer's agreement related to the overall project that controls the timing of some required <br />off-site improvements. That agreement, approved by the Board July 12, 2005, allows the County to <br />withhold issuance of building permits if certain improvement thresholds are not met. Currently, the <br />agreement is being updated and revised by the applicant and County staff and will be presented to the <br />Board at a future meeting for Board consideration and approval. <br />On November 18, 2004, the Planning & Zoning Commission granted conditional preliminary PD <br />plan/plat approval for all phases of the Millstone Landing PD. The applicant subsequently obtained a <br />land development permit and commenced construction on the improvements. As of this time, for <br />phases 4, 5, and 6 the applicant has built 98% of the required on-site subdivision improvements, and <br />has "bonded -out" for the remaining 2% of the required improvements. One of the conditions of PD <br />approval is to improve 23`d Street SW that is adjacent to the southern perimeter of phases 4, 5, and 6. <br />The 23`d Street SW off-site improvement is not complete at this time and the applicant is "bonding <br />out" to secure that improvement. The applicant has submitted the following: <br />1. A final plat in conformance with the approved preliminary PD plan/plat for phases 4, 5, and 6; <br />2. An Engineer's Certified Cost Estimate for the remaining required subdivision improvements <br />for phases 4, 5, and 6; <br />116 <br />FACommunity Development\CurDev\Final Plats\BCC staff reports\2016 FPrpts\Mi11stone4-6.rtf <br />
The URL can be used to link to this page
Your browser does not support the video tag.