My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/04/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
10/04/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 1:44:43 PM
Creation date
12/21/2016 11:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/04/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Coastal Engineer <br />SUBJECT: Release of Retainage - Work Order No. 8 Morgan & Eklund, Inc. <br />2016 Beach Profile Monitoring Surveys (SUMMER) <br />DATE: September 12, 2016 <br />DESCRIPTION AND CONDITIONS <br />On October 1, 2013, the Board approved a contract with Morgan & Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a one-year term. The Board amended the <br />contract on October 7, 2014 and again on September 15, 2015; renewing the contract until <br />September 30, 2016. M&E is the selected County Consultant for professional onshore/offshore <br />hydrographic surveying services. <br />On May 10, 2016, the Board approved Work Order No. 8 to this contract for services related to <br />semiannual hydrographic surveying (beach profile) for the countywide shoreline monitoring <br />program. Specifically, Work Order No. 8 was for summer 2016 beach profile surveys in the <br />amount of $49,500 and included 3 separate tasks and 3 separate project accounts. To date all <br />tasks are 100% completed. The total amount of retainage withheld under Work Order No. 8 is <br />$4,950 and is broken out by tasks as follows: <br />Task 1: Summer 2016 Sector 3 Beach and Dune Restoration Project Post Construction Monitoring <br />Survey <br />Task 1 totaled $17,050. The total amount of retainage withheld is $1,705. <br />Task 2: Summer 2016 Sector 7 Post Construction Monitoring <br />Task 2 totaled $6,600. The total amount of retainage withheld is $660. <br />Task 3: Summer 2016 Countywide Beach Monitoring <br />Task 3 totaled $25,850. The total amount of retainage withheld is $2,585 <br />FAPublic Works\.lamesG\Sector 3\Morgan and Eklund Work Orders\WO No. 8\agenda item -- WO No 8-- Morgan <br />and Eklund Surveying 2016 Summer -- Release of Retainage.docx <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.