Laserfiche WebLink
Consent Agenda Item <br />INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: September 21, 2016 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager Aw <br />Subject: Change Order No.1 with Harn R/O Systems for the Implementation of <br />Membrane Replacement for RO Skids at North County RO Water Treatment <br />Plant. <br />DESCRIPTIONS AND CONDITIONS: <br />On April 19, 2016, the Indian River County Board of County Commissioners (BCC) awarded the <br />contract for the North County Reverse Osmosis (NCRO) Water Treatment Plant Membrane <br />Replacement Project to Harn R/O Systems, Inc., at a cost of $1,041,629.00. Indian River County <br />Department of Utility Services (IRCDUS) owns and operates two (2) regional potable water treatment <br />facilities. The NCRO water treatment plant is rated for 11.44 million gallons per day (mgd). The <br />existing membranes on skids #1 and #2 and stage 2 of skids #5 and #8 at the NCRO water treatment <br />plant are more than 15 years old and ready for replacement, due to higher operating pressures and <br />their inability to achieve the design -rated capacity of 1.5 mgd. Replacement will consist of removal <br />and disposal of the existing elements, swabbing/cleaning of the existing pressure vessels, disinfection <br />of RO skid product piping, installing new membrane elements, and the flushing, startup, and testing <br />of new membranes. <br />During the shop drawing review process, DOW Chemical Company, the manufactures of the FILMTEC <br />RO nanofiltration elements, required mandatory measurements and recording of the new elements <br />on a daily/hourly frequency of operating parameters in order for the warranty to be valid. Beyond <br />satisfying the warranty requirement, the operating parameters gathered frequently will enable the <br />NCRO plant operators to make crucial decisions on operating procedures. <br />ANALYSIS: <br />To accomplish the mandatory measurements and recording, it is required that several <br />instrumentations, gauges, sensors and analyzers be installed in all eight (8) skids. Also, part of the <br />subject change order is to include additional spare parts such as head seals, securing rings, permeate <br />port retainers, etc. Change Order No.1 results in a net increase of $90,007.58 for a total revised <br />contract amount of $1,131,636.58 to the Harn R/O contract. The subject change order will also <br />increase the contract time by an addition of sixty (60) calendar days. The additions are outlined in <br />more detail in the attached Change Order No.1 documents. <br />F:\Utilities\UTILITY - Engineering\WATER\RO Membra nes\Admin\Agenda -Change Order No.l.docx 75 <br />