Laserfiche WebLink
PROPOSAL <br />mairm <br />MGM .m 1witwo <br />HARN R/O SYSTEMS, INC. -310 CENTER COURT- VENICE, FLORIDA 34285 <br />(1') 941-488-9671 - F 941-488-9400 <br />Kimley-Horn <br />ATTN: NICK BLACK <br />8/24/2016 <br />1920 Wekiva Way, <br />Email: Nick.Black@kimley-horn.com <br />West Palm Beach, FL 33411 <br />Proposal Request: Finished Water Sample Panel, Total <br />Permeate Pressure Transmitters (Trains #1 & #2), Total <br />Permeate Conductivity Transmitters (Trains # 1-8), <br />Trains #1 & #2 Spare Parts <br />Dear Mr. Black, <br />Ham R/O Systems, Inc. is pleased to present the following combined change request proposal for The North Hobart WTP <br />Membrane Replacement Project. <br />Task # 1: <br />This request includes this supply, installation, and calibration of the instrumentation scope of supply detailed below: <br />- Provide eight (8) Rosemount 1056 total permeate conductivity analyzers; one for each train (1-8). Analyzers <br />shall be 24VDC loop powered. Analyzer will be provided with 2 Channel contacting conductivity <br />capabilities and 4-20mA output. Should HART protocol be required please add $635.00 per transmitter. <br />- Provide eight (8) Rosemount 400 VP total permeate conductivity sensors; one for each train (1-8). Sensors to <br />be installed on the total permeate line of each train. <br />- Provide two (2) Rosemount 3051 smart pressure transmitters; one for train 1 and one for train 2. Pressure <br />transmitters shall be 24VDC loop powered and provided complete with -14.7-300 psig pressure range 4- <br />20mA output with HART protocol, local LCD operator display, and integral 3 valve manifold. <br />- Provide and install electrical wiring as required to add instruments to existing trains. Verify existing cables and <br />or provide cables from proposed added instruments to RIO- 2 for Train 1-4 and RIO -5 for Trains 5-8. Label <br />all new cables and terminate within the RIO cabinets. <br />- Installation includes PVC installation fittings complete with 316 stainless steel hardware as required for a <br />complete installation. <br />- Integration of instrumentation into plant SCADA shall be by others. <br />Exceptions and Clarifications: <br />1. SCADA Programming, <br />2. Additional Instrument I/O cards (if required) <br />3. Additional time may be required and will be requested upon receipt of additional equipment for incorporation <br />into the work. <br />4. Expected lead time for equipment 6-8 weeks after receipt of order. <br />