Laserfiche WebLink
SECTION 00948 - Work Change Directive <br />No. 4 <br />DATE OF ISSUANCE: 3-23-16 EFFECTIVE DATE: 3-23-16 <br />OWNER: Indian River County <br />CONTRACTOR: Timothy Rose Contracting, Inc, <br />Project: 2011' Avenue & 161' Street Intersection Improvements <br />OWNER's Contract No. 0225 <br />Bid No.02 15037 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />To provide an additional 25 days to the contact time due to rain delays. <br />To provide an additional 6 days to the contact time due to additional time for Box culvert <br />procurement. <br />To provide an additional 36 days to the contact time due to the 9'x6' Box culvert <br />manufacturers defects and remediation. <br />Purpose of Work Change Directive: <br />This work. change directive provides a total of 67 additional days to the contact time due to <br />rain delays, Box culvert procurement, and 9'x6' Box culvert manufactures defect <br />remediation. <br />Attachments: Letter from Timothy Rose Contracting, Inc. dated March 7, 2016. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change In <br />Contract Prices: NONE <br />II Unit Prices <br />HLump Sum <br />Other: <br />j] By Work Change Directive: <br />Method of determining change In <br />Contract Times; 67 Days <br />JK Contractor's Records <br />JK Engineer's Records <br />Q Other. <br />f 3 By Change Order. <br />Estimated increase of this Work Change Directive Estimated increase In Contract Times: <br />$0.00 Substantial Completion: 67 days; 3-30-16 <br />Ready for Final Completion: 67 days; 4-29-16 <br />If the change involves an increase, the estimated If the change Involves an Increase, the estimated <br />amount Is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTS <br />RECOii MEN 513: <br />APPROVED: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: 2-3.1 <br />1 Date: �?3t' to <br />Data: <br />F,.WuWk W ksIEWHEERING DMSION PROJECTSW25 20th Ave and 161h St War=Wn kr4w(wementAdml nNork Ct" DkecgvasM48 - <br />Work Champ DkiecNe4.doc <br />104 <br />i <br />