My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/01/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
11/01/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:53:39 AM
Creation date
1/4/2017 2:56:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/01/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 5 <br />DATE OF ISSUANCE; 3-23-16 EFFECTIVE DATE: 3-23-16 <br />OWNER: Indian River Co <br />CONTRACTOR: Timothy Rose Contractina, Inc. <br />Project: 200, Avenue & 161h Street Intersection improvements <br />OWNER's Contract No. 0226 <br />Bid No. 2015037 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Station 17+30, Remove and replace an existing box structure with a Type'C' Inlet and Yard . <br />Drain <br />Station 22+30, Remove and replace an existing box structure top with a Type P top. <br />Station 23+00, Remove and replace an existing box structure with a Type'G Inlet. <br />Purpose of Work Change Directive: <br />This work change directive provides necessary drainage structures as deemed necessary <br />during construction. The contractor Is requesting an additional 14 days to the contract time <br />for procurement and installation. <br />Attachments: Quotation from Timothy Rose Contracting, Inc. dated March 10, 2016. <br />American Concrete Industries, Inc. Structure Shop Drawings dated March 8, 2016 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change In <br />Contract Prices: <br />El Unit Prices <br />L3 Lump Sum <br />Other. Quotation tW Contractor <br />Q By Work Change Directive: <br />Method of determining change in <br />Contract Times: 14 days <br />[1 Contractor's Records <br />Q Engineers Records <br />JK Other. Quotation by Contractor - addi8onal time <br />j] By Change Order: <br />Estimated increase of this Work Change Directive Estimated increase in Contract Times: <br />$7,828.00 Substantial Completion: 14 days; 4-13-16 <br />Ready for Final Completion: 14 days; 5-13-16 <br />If the change Involves an increase, the estimated If the change Involves an increase, the estimated <br />amount Is not to be exceeded without further time is not to be exceeded without further <br />authorization, authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />B <br />By: ';' <br />By. <br />i <br />CONTRACTOR ( gnature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />?-3 <br />Date: a � / <br />Date: S -a-S- 16 <br />Date: ��-)! l b <br />F,%FVWk watcsWW1NEERING OMSION PROJECTSMa 201h Ave and 16th St Intersec8on ImprovemenWmimMoik Change DkecQvresWM8 - <br />Wank Change WeAve 6.doc 106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.