My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/01/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
11/01/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:53:39 AM
Creation date
1/4/2017 2:56:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/01/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br />No. 6 <br />DATE OF ISSUANCE 5-10-16 EFFECTIVE DATE: 5-10-16 <br />OWNER: Indian River County <br />CONTRACTOR: Timothy Rose Contracting, Inc. <br />Project- <br />ontractingIncProject: 2& Avenue & 16th Street Intersection Improvements <br />OWNER's Contract No. 0225 <br />Bid No. 2016037 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Replace two existing box structures at Stations 18+30 and 18+65 with a Type'C' inlet. <br />Install 32 linear feet of 12' x 18" Reinforced Concrete Pipe connecting the two new type C <br />Inlets. <br />Purpose of Work Change Directive: <br />This work change directive provides necessary replacement two drainage structures and <br />piping of the road crossing at 151 Lane at 20 Avenue as deemed necessary during <br />construction. <br />The contractor is requesting an additional 7 days to the contract time for procurement and <br />installation. <br />Attachments: Quotation from Timothy Rose Contracting, Inc. dated April 25, 2016. <br />American Concrete Industries, Inc. Structure Shop Drawings dated April14, 2016 <br />If OWNER or CONTRACTOR believe that the above change has affected Contratt Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents, <br />Method of determining change in <br />Contract Prices: <br />❑ Unit Prices <br />Q Lump Sum <br />Other. Quotation by Contractor <br />Q By Work Change Directive: <br />Method of determining change in <br />Contract Times: 7 days' <br />Q Contractor's Records <br />Engineer's Records <br />Other. Quotation .by Contractor - additional dme <br />Q By Change Order <br />Estimated increase of this Work Change Directive Estimated increase in Contract Times <br />$4,414.40 Substantial Completion: 4-20-16 <br />Ready for Final Completion: 5-20-16 <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount Is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPT : <br />RECOMMENDED: <br />APPROV D: <br />By. <br />By. �.,. <br />By, <br />XONTRACTOR (Signature) <br />EN bfNE Signature) <br />OWNER (Signature) <br />Date: 4-( I c 1 <br />pate: S " 16 <br />Date: 3 !t %� <br />F' Pd&- V4orkslENGtNEER1NG DIVISION PROJECTS10= 20th A" and 18th St Intemecgon Impwenwd%ddrnXWork Change Oirecthres10W8 - <br />Wark Change O6ective etloc - - <br />115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.