My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/01/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
11/01/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:53:39 AM
Creation date
1/4/2017 2:56:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/01/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />DATE OF ISSUANCE: 9-22-16 <br />OWNER: Indian River County <br />CONTRACTOR: _Timothy Rose Contracting Inc. <br />Project 20th Avenue & 161 Street Intersection Improvements <br />OWNER's Contract No. 0226 <br />Bid No. 2015037 <br />No. 7 <br />EFFECTIVE DATE: 9-22-16 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />To provide an additional 119 days to the contact time due to a water main break and repair <br />in the project area. <br />Purpose of Work Change Directive: <br />The Substantial Completion date was postponed to August 17, 2016 due to a City of Vero <br />Beach water main break within the project site. The water main break occurred near the <br />completion of the project delaying the final work. <br />Attachments: none <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />[1 Unit Prices <br />II Lump Sum <br />[1 Other. <br />II By Change Order. <br />Estimated increase of this Work Change Directive <br />$0 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />)� Engineer's Records <br />II Other. <br />Q By Change Order. <br />Estimated increase in Contract Times: <br />Substantial Completion: 119 days; 8-17-16 <br />Ready for Final Completion: 119 days; 9-16-16 <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTE <br />RECOMMENDED: <br />oe <br />APPROVED:"" w ENrts <br />g <br />By: <br />By. <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OW R (Signature) <br />Date: �Le G f� <br />Date: I/ 2 G 116 <br />Date: !Al" - <br />#1 1 <br />00948 - Work Change Directive 7 <br />F:1PuNic WorksIENGINEERING DIVISION PROJECTS0225 2Dth Ave and 16th St Intersection ImprovemenWn-iimlWork Change DirectivesMM - 121 <br />Work Change Direclive 7.doc <br />