Laserfiche WebLink
PROFESSIONAL SERVICES <br />UNIT <br />QUANTITY <br />UNIT COST <br />TOTAL COST <br />INCOMPLETE % COMPLETE <br />ENGINEERING INSPECTION SERVICES <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />0 <br />ENGINEERING FINAL CERTIFICATION <br />LS <br />1 <br />$1,500.00 <br />$1,500.00 <br />$1,500.00 <br />0 <br />GEOTECHNICAL TESTING <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />$750.00 <br />95 <br />SURVEY AS-BUILTS <br />LS <br />1 <br />$2,000.00 <br />$2,000.00 <br />$2,000.00 <br />0 <br />SUBTOTAL PROFESSIONAL SERVICES <br />$23,500.00 <br />$9,250.00 <br />j <br />TOTAL COST <br />INCOMPLETE <br />PHASE II TOTALS <br />$440,434.82 <br />$54,507.58 <br />PROPOSED BOND AMOUNT (125%) <br />$68,134.48 <br />G:. V/TT''% <br />�. • ��G E NSF r= <br />No. 595 <br />/6 <br />e5u5VAUEfQIiN.L.,•-514 36 <br />�S <br />F<ORIDP.•' ,� <br />NAL IE \ \�\ <br />ATTACHMENT 4 72 <br />