My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/08/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
11/08/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:59:25 AM
Creation date
1/4/2017 4:50:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/08/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following <br />This Agreement (pages 00520-1 to 00520-1( <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to <br />4. Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6, inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor and Mapper's Certification as to Elevations and <br />Locations of the Work (page 00634-1); <br />9. General Conditions (pages 00700-1 to 00700-44, inclusive); <br />10. Supplementary Conditions (pages 00800-i to 00800-11, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Devision 2 <br />(Technical Specifications); <br />f <br />12. Drawings consisting of a cover sheet and sheets numbered 2 through 64, inclusive, <br />with each sheet bearing the following general title: 81' ST. SIDEWALK <br />IMPROVEMENTS; <br />13. Addenda (numbers to , inclusive); <br />14. Appendices to this Agreement (enumerated as follows); <br />Appendix A — Title VI/Nondiscrimination Policy Statement <br />Appendix B - Indian River County Fertilizer Ordinance <br />Appendix C - Federal Required Contract Provisions <br />Appendix D - FHWA 1273 <br />Appendix E - Permits <br />Appendix F — Indian River County Traffic Division Special Conditions for Right -Of -Way <br />Construction <br />00520 - Agreement (Public Works) FOR LAP PROJECTS ONLY SAMPLE <br />00520-6 <br />F:\Public WorkskENGINEERING DIVISION PROJECTS\1049 8th St Sidewalk Improvements (58th Ave to 21st Court)Wdmm\bid documents\LAP Documents\00520 - 92 <br />Agreement (Public Works) FOR LAP PROJECTS ONLY SAMPLE.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.