My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-106
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 12:57:38 PM
Creation date
1/5/2017 2:03:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/19/2014
Control Number
2014-106
Agenda Item Number
8.FF.
Entity Name
G.K. Environmental Inc.
Subject
Amendment No. 6 to Work Order No.1
Oslo Road Boat Ramp
Project Number
0381
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. K. ENVIRONMENTAL, INC. <br />Environmental Consulting <br />GEORGE R. KULCZYCKI, CEC, CES, CEI <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone 772-567-9129 <br />Fax 772-567-6245 <br />Email gkea,me.com <br />EXHIBIT A <br />G. K. Environmental, Inc. Fee Schedule & GKE Subcontractor Fee Schedule <br />10/1/13-9/30/15 <br />G. K. Environmental, Inc. Fee Schedule <br />President, Principal Ecologist $120.00 / hour (or lump <br />sum) <br />Administrative Assistance $ 45.00 / hour (or lump <br />sum) <br />GKE boat / fuel / associated sampling equipment $ 65.00 / hour (or lump <br />sum) <br />Phase I Audits / Environmental Site Assessments GKE Standard Fee: <br />(includes historic aerial site reviews / onsite inspections, $2,975.00 (<5.0 acre site) <br />and evaluations of: hazardous waste, preliminary endangered & <br />threatened species, and approximate wetland locations) <br />GKE reimbursement expenses <br />$0.45; <br />invoice <br />photo b/w copies $0.15; <br />photo color copies <br />postage: per postage <br />G. K. Environmental, Inc. Subcontractor Coordination and Supervision Services Fee Schedule <br />Landscape & Maintenance Service per bid / event <br />Archaeological Service per bid / event <br />CAD Operator $ 70.00 per hour <br />Field Assistant I. $ 40.00 per hour <br />Field Assistant II Biologist / Chemist $ 75.00 per hour <br />Ge4-rgei R. Ku1c-izeyck& September 20, 2013 <br />George R. Kulczycki, President, Principal Ecologist Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.