My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-107
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 12:27:53 PM
Creation date
1/5/2017 2:08:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/19/2014
Control Number
2014-107
Agenda Item Number
8.J.J.
Entity Name
Florida Department of Transportation
Subject
Local Agency Agreement
Old Dixie Highway Sidewalk
Area
38th Lane to 45th St.
Project Number
0845B
Document Relationships
2014-067
(Attachment)
Path:
\Resolutions\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL STATEMENT — Local Agency Program <br />No Additional Right of Way Required <br />RNV ITEM/SEGMENT NO N/A <br />CONST ITEM SEGMENT NO <br />F.A.P NO <br />423186-2-58-01 <br />SRTS-337-A <br />STATE ROAD N/A <br />Construction of a 5' wide concrete sidewalk <br />along the east side of Old Dixie Highway <br />DESCRIPTION between 38`h Lane and 45"' Street <br />PREFERRED LETTING DATE. Sept. 10, 2014 LOCAL AGENCY <br />Indian River County <br />The following interests in land (Right of Way) will NOT be required for the construction of this project. <br />® Fee Title — land on which a permanent improvement is to be placed and maintained. <br />® Perpetual Easement — may be used when permanent improvement is to be constructed and <br />maintained on a parcel for which acquisition of fee title is impractical. <br />® Temporary Easement — used when it is necessary to temporarily occupy a parcel No <br />improvement that is a permanent part of the transportation facility or that requires maintenance <br />beyond the term of the easement will be constructed on the temporary easement. <br />The right of way maps/sketches have been compared to the construction plans and the right of way, <br />as shown, will accommodate the planned construction. The construction activities will be performed <br />in the existing right of way. The contractor will not be required to temporarily enter upon property not <br />owned by INDIAN RIVER COUNTY for the purpose of restoration and harmonization. There are no <br />encroachments within existing right of way that impact the construction project. <br />3-17--[q <br />SIGNATURE <br />Michael D. Nixon <br />NAME (Printed) <br />Title: Roadway Production Manager <br />Agency, Indian River County <br />Rev 4/12111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.