My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-212
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2018 12:34:51 PM
Creation date
1/9/2017 9:55:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/20/2016
Control Number
2016-212
Agenda Item Number
15.A.5
Entity Name
Barth Construction
Subject
Work Order No.2 Fire Rescue Station No.14
Area
26th St. and 66th Ave.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br />Emergency Services District Board of Commissioners <br />4225 43rd Avenue <br />Vero Beach, Florida 32960 <br />Telephone• (772) 226-3900 FAX• 772-567-9323 <br />Project: <br />Fire Station 14, 26th Street and 66th Avenue <br />Preparation and Improvements <br />Emergency Services District <br />WORK ORDER NO. 2 <br />FOR <br />DESIGN/BUILD AGREEMENT <br />PHASE I <br />WITH <br />Barth Construction, Inc <br />This Work Order No 2 is in accordance with the existing DESIGN/BUILD AGREEMENT <br />PHASE I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian <br />River County (County) This Work Order No 2 amends the agreement as follows <br />SECTION I — PROJECT LIMITS <br />This Work Order No 2 is for the Design/Builder to perform work in connection with the <br />Preparation and Improvements to the proposed Fire Station 14 located at 26th Street and 66th <br />Avenue <br />SECTION II - SCOPE OF SERVICES <br />Completion of site development to include, installation of the fire line and DDCV, connection of <br />the water service to new fire station building, installation of new pad, mount FPL transformer <br />and underground feeders, installation of the remaining site drainage systems and final grading <br />of site, installation and completion of the site concrete drives, parking and sidewalks, completion <br />of the onsite landscape, sod grassing and irrigation system and construction of a 3 bay, <br />prototype fire station building based upon the drawing set dated December 8, 2015 <br />SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a Time for Completion shall be prior to October 1, 2017 <br />SECTION IV — COMPENSATION <br />The County agrees to pay, and the Design/Builder agrees to accept, for the above described <br />services rendered a total amount of $2,446,869 00 <br />Any additional services not described hereon shall be pre -approved by the County <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.