My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-121B
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-121B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:17:23 PM
Creation date
1/9/2017 2:23:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/09/2014
Control Number
2014-121B
Agenda Item Number
8.O.
Entity Name
Dato Construction
Subject
Roof Replacement Fire Station No.11
Area
2555 93rd. St. Wabasso
Bid Number
2014047
Alternate Name
Camp Dresser & McKee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 06 A certificate of insurance shall be provided to the COUNTY's Risk Manager for review and <br />approval, ten (10) days prior to commencement of any work under this Agreement. The COUNTY shall <br />be named as an additional insured on all policies except workers' compensation and professional <br />liability <br />6 07 The insurance companies selected shall send written verification to the COUNTY's Risk Manager <br />that they will provide 30 days prior written notice to the COUNTY's Risk Manager of its intent to cancel <br />or modify any required policies of insurance <br />6 08 CONTRACTOR shall include all Subcontractors as insured under its policies or shall furnish <br />separate cer:ificates and endorsements for each Subcontractor All coverages for Subcontractors shall <br />be subject tc all of the requirements stated herein <br />6.09 The COUNTY, by and through its Risk Manager, reserves the right periodically to review any and <br />all policies of insurance and to reasonably adjust the limits of coverage required hereunder, from time <br />to time throughout the term of this Agreement In such event the COUNTY shall provide the <br />CONTRACTOR with separate written notice of such adjusted limits and CONTRACTOR shall comply within <br />thirty (30) days of receipt thereof The failure by CONTRACTOR to provide such additional coverage shall <br />constitute a default by CONTRACTOR and shall be grounds for termination of this Agreement by the <br />COUNTY <br />6 10 The CONTRACTOR shall indemnify and hold harmless the COUNTY, and its officers and <br />employees, from liabilities, damages, losses, and costs, including, but not limited to, reasonable <br />attorneys' fees, arising out of or related to the negligence, recklessness, or intentionally wrongful <br />conduct of the CONTRACTOR and other persons employed or utilized by the CONTRACTOR in the <br />performance of this Agreement <br />ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS <br />7 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related <br />data identified in the Invitation to Bid documents <br />B CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, <br />and Site conditions that may affect cost, progress, and performance of the Work <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, slate, and local Laws and Regulations <br />that may affect cost, progress, and performance of the Work. <br />D CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br />means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto <br />
The URL can be used to link to this page
Your browser does not support the video tag.