My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:17:28 PM
Creation date
1/9/2017 2:27:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/09/2014
Control Number
2014-122
Agenda Item Number
8.T.
Entity Name
MBV Engineering
Subject
Work Order No. 5 Amendment No. 2
Storage and piping tank modifications
Area
South County RO Facility
Project Number
12-276
Alternate Name
Camp Dresser & McKee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEMBV <br />ENGINEERING, INC. <br />MOIA BOVVLESVILLAMIZAR & ASSOCIATES <br />www.mbveng.com CA 143728 <br />August 20, 2014 <br />Mr. Vincent Burke, P.E. <br />c/o Mr. Arjuna Weragoda <br />Indian River County Department of Utility Services <br />1801 27th Street <br />Vero Beach, FL 32960-3388 <br />Via E-mail (aweragoda@ircgov.com) <br />Subject: Proposal / Contract for Professional Engineering Services <br />for the Indian River County Utility Services - South RO Water Plant Storage <br />Tank Interconnect Project <br />Indian River County, Florida <br />Engineer's Project Number: 12-276 Addendum 2 <br />Dear Mr. Burke: <br />We are hereby submitting our proposal to provide professional services for the above subject <br />project. Per your request, we will be adding a conduit run, and pull box for future connection to <br />well No. 4. Also included are the expenses incurred regarding review of shop drawings, addition <br />of a flow meter, and historical record archiving. Based on our understanding, our additional scope <br />of work includes the following services: <br />1. Engineering design for conduit run and pull box location <br />2. Revision of the plans to include the new conduit and pull box <br />3. Coordination with contractor for bidding <br />4. Construction oversight of the project <br />5. Review of shop drawings including revised materials selected <br />6. Addition of flow meter including SCADA connection and plan revisions <br />7. On site review of historical records necessary to verify existing system specifications due <br />to conflicting as -built information <br />We propose to provide the above described services for a total fee of $3,750. <br />Should you require further information or clarification, please do not hesitate to call. <br />Very truly yours, <br />MBV E JIP 0, INC. <br />Aaron Bowies, P.E., Vice President <br />1835 2Crth Street <br />Vero Beach, FL 32960 <br />772.569.0035 <br />Fax: 772.778.3617 <br />1250 W Eau Gallie Blvd., Suite L <br />Melbourne, FL 39235 <br />321.253.1510 <br />Fax: 321.253.0911 <br />806 Delaware Avenue <br />Ft. Pierce, FL 34950 <br />772.468,9055 <br />Fax: 772,778.3617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.