My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. If ENGINEER does not render a formal <br />decision in writing within the time stated in paragraph <br />10.05.8, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.B. <br />- <br />direct employ of CONTRACTOR in the perfor <br />without limitation superintendents, foremen, <br />Site. Payroll costs for employees not employed <br />the basis of their time spent on the Work. <br />contributions, unemployment, excise, and <br />and retirement benefits, bonuses, sick leave, <br />the extent authorized by OWNER. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field' services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />Subcontractors. If required by OWNER, CON- <br />TRACTOR shall obtain competitive bids from <br />subcontractors acceptable to OWNER and <br />CONTRACTOR and shall deliver such bids to <br />OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any, will be <br />acceptable. If any subcontract provides that the <br />Subcontractor is to be paid on the basis of Cost <br />of the Work plus a fee, the Subcontractor's <br />Cost of the Work and fee shall be determined <br />in the same manner as CONTRACTOR's Cost <br />of the Work and fee as provided in this para- <br />graph 11.01 <br />4. Costs of special consultants <br />(including but not limited to engineers, <br />architects, testing laboratories, surveyors, <br />attorneys, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the <br />following: <br />a. The proportion of necessary trans- <br />portation, travel, and subsistence expenses of <br />CONTRACTOR's employees incurred in dis- <br />charge of duties connected with the Work. <br />b. Cost, including transportation and <br />maintenance, of all materials, supplies, equip- <br />ment, machinery, appliances, office, and <br />temporary facilities at the Site, and hand tools <br />not owned by the workers, which are consumed <br />in the performance of the Work, and cost, less <br />market value, of such items used but not con- <br />sumed which remain the property of CON- <br />TRACTOR. <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 32 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \05308 13th Street SW at 56th Ave BridgelAdmin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.