My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
View images
View plain text
parties that might entitle CONTRACTOR to be <br />paid additionally by OWNER or entitle OWNER <br />to withhold payment to CONTRACTOR. <br />4. Neither ENGINEER's review of <br />CONTRACTOR's Work for the purposes of <br />recommending payments nor ENGINEER's <br />recommendation of any payment, including final <br />payment, will impose responsibility on <br />ENGINEER to supervise, direct, or control the <br />Work or for the means, methods, techniques, <br />sequences, or procedures of construction, or <br />the safety precautions and programs incident <br />thereto, or for CONTRACTOR's failure to <br />comply with Laws and Regulations applicable to <br />CONTRACTOR's performance of the Work. <br />Additionally, said review or recommendation will <br />not impose responsibility on ENGINEER to <br />make any examination to ascertain how or for <br />what purposes CONTRACTOR has used the <br />moneys paid on account of the Contract Price, <br />or to determine that title to any of the Work, <br />materials, or equipment has passed to <br />OWNER,free and clear of any Liens. <br />5. ENGINEER may refuse to recom- <br />mend the whole or any part of any payment if, <br />in ENGINEER's opinion, it would be incorrect to <br />make the representations to OWNER referred <br />to in paragraph 14 02.6.2. ENGINEER may <br />also refuse to recommend any such payment <br />or, because of subsequently discovered <br />evidence or the results of subsequent <br />inspections or tests, revise or revoke any such <br />payment recommendation previously made, to <br />such extent as may be necessary in <br />ENGINEER's opinion to protect OWNER from <br />loss because: <br />a. the Work is defective, or completed <br />Work has been damaged, requiring <br />correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />d. ENGINEER has actual knowledge of <br />the occurrence of any of the events cnumcr <br />ated in paragraph 15.02.A. <br />C. Payment Becomes Due <br />Application for Payment to OWNER with <br />ENGINEER's recommendation, the amount <br />paragraph 14.02.D) become due, and when <br />-- - - e_.er <br />D. Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs 14.02.6.5.a through <br />14.02.B 5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 40 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \0530B 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents100700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).