Laserfiche WebLink
construction expressly required by the Bidding Documents, and safety precautions and programs <br />incident thereto; <br />F. agree at the time of submitting its Bid that no further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the determination of its Bid for performance <br />of the Work at the price bid and within the times and in accordance with the other terms and <br />conditions of the Bidding Documents; <br />G. become aware of the general nature of the work to be performed by OWNER and others <br />at the Site that relates to the Work as indicated in the Bidding Documents; <br />H. correlate the information known to Bidder, information and observations obtained from <br />visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br />examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; <br />I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br />resolution thereof by ENGINEER is acceptable to Bidder; and <br />J. determine that the Bidding Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for the performance of the Work. <br />4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br />premised upon performing and furnishing the Work required by the Bidding Documents and <br />applying any specific means, methods, techniques, sequences, and procedures of construction <br />that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br />given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br />has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br />acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br />convey understanding of all terms and conditions for performing and furnishing the Work. <br />ARTICLE 5 - PRE-BID CONFERENCE <br />5.01 The date, time, and location for a Pre -Bid conference, if any, are specified in the <br />Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss <br />the Project. Bidders are highly encouraged to attend and participate in the conference. <br />ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER <br />considers necessary in response to questions arising at the conference. Oral statements may not <br />be relied upon and will not be binding or legally effective. <br />00200 - Instructions to Bidders REV 04-07.doc <br />00200 - 4 <br />F \Public Works\ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge \Admin\bid documents Master Contract Documents\00200 - Instructions to <br />Bidders REV 04-07.doc Rev 05/01 <br />