My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.03 Bid Security of other Bidders whom OWNER believes do not have a reasonable <br />chance of receiving the award will be returned within seven days after the Bid opening. <br />ARTICLE 9 - CONTRACT TIMES <br />9.01 The number of calendar days within which, or the dates by which, the Work is to be (a) <br />Substantially Completed and (b) also completed and ready for final payment are set forth in the <br />Agreement. <br />ARTICLE 10 - LIQUIDATED DAMAGES <br />10.01 Provisions for liquidated damages, if any, are set forth in the Agreement. <br />ARTICLE 11 - SUBSTITUTE AND "OR -EQUAL" ITEMS <br />11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or <br />described in the Bidding Documents without consideration of possible substitute or "or -equal" <br />items. Whenever it is specified or described in the Bidding Documents that a substitute or "or - <br />equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to <br />ENGINEER, application for such acceptance will not be considered by ENGINEER until after the <br />Effective Date of the Agreement. The procedure for submission of any such application by <br />CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may <br />be supplemented in the General Requirements. <br />ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS <br />12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, <br />individuals, or entities to be submitted to OWNER in advance of a specified date prior to the <br />Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so <br />requested, shall within five days after Bid opening, submit to OWNER a list of all such <br />Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for <br />which such identification is required. Such list shall be accompanied by an experience statement <br />with pertinent information regarding similar projects and other evidence of qualification for each <br />such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or <br />ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, <br />Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent <br />Successful Bidder to submit a substitute, without an increase in the Bid. <br />12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may <br />award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, <br />Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute <br />grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or <br />entity so listed and against which OWNER or ENGINEER makes no written objection prior to the <br />giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to <br />revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph <br />6.06 of the General Conditions. <br />00200 - Instructions to Bidders REV 04-07.doc <br />00200 - 6 <br />F1Public Works\ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents\00200 - Instructions to <br />Bidders REV 04-07 doc Rev 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.