My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. "SILTSACK" (regular flow), supplied by ACF Environmental, Inc. (1- <br />800-448-3636). <br />b. "FloGuard+PLUS," supplied by Kristar Enterprises, Inc. (1-800-579- <br />8819). <br />c. Or equivalent. <br />G. Construction Site Egress Driveways: Minimize the transport of sediment and soil <br />from the construction site or work area by vehicle wheels. Construct a crushed rock <br />driving surface at the vehicle exit point(s). Provide an area large enough to remove <br />the sediment and soil from vehicle wheels before the vehicle leaves the construction <br />site or work area. Provide wash -down stations as required to wash vehicle tires and <br />retain all washwater on-site. Do not use limerock. <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Crushed limerock shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually granite), <br />washed and meeting the requirements of FDOT Standard Specifications for <br />Road and Bridge Construction, Section 901. <br />I. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Erosion & Water Pollution Control - Lump Sum <br />01025-10 Technical Specifications <br />F\Public Works\ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master <br />Contract Documents\Technical Specifications, SEC 104, Add 2, 8-7-14.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.