My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />B. TEMPORARY SANITARY FACILITIES <br />1. Provide temporary toilet facilities separate from the job office. <br />Maintain these during the entire period of construction under this <br />Contract for the use of all construction personnel on the job. <br />Provide enough chemical toilets to conveniently serve the needs of <br />all personnel. Properly seclude toilet facilities from public <br />observation. <br />2. Chemical toilets and their maintenance shall meet the requirements <br />of State and local health regulations and ordinances. Immediately <br />correct any facilities or maintenance methods failing to meet these <br />requirements. Upon completion of work, remove the facilities from <br />the premises. <br />1.4 SECURITY <br />Full time watchmen will not be specifically required as a part of the Contract, but <br />the CONTRACTOR shall provide inspection of work area daily and shall take <br />whatever measures are necessary to protect the safety of the public, workmen, <br />and materials, and provide for the security of the site, both day and night. <br />1.5 TEMPORARY CONTROLS <br />Take all necessary precautions to control dust and mud associated with the work <br />of this Contract. In dry weather, spray dusty areas daily with water in order to <br />control dust. Take necessary steps to prevent the tracking of mud onto adjacent <br />streets and highways. <br />1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />Remove the various temporary facilities, services, and controls and legally <br />dispose of them as soon as the work is complete. The areas of the site used for <br />temporary facilities shall be properly reconditioned and restored to a condition <br />acceptable to the OWNER. <br />+ + END OF SECTION + + <br />01520-2 <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge \Admin\bid documents\Master <br />Contract Documents\01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.