My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
donate them to the County free of charge. (See Paragraph C, Special Provisions) <br />The Contractor shall transport the culverts to the County's storage yard. All metal <br />castings for catch basins, manholes, or other structures shall be carefully removed <br />and stored in the County's Storage Yard if they are deemed salvageable by the <br />Engineer. The excavated materials shall be removed from the job site and disposed in <br />a location designated or approved by the Owner. Any culverts, structures or any <br />material excavated or removed from the project site under clearing and grubbing <br />deemed unsalvageable by the Engineer shall be disposed of in a legal manner by the <br />Contractor. Where required, suitable material as approved by the Engineer shall then <br />be backfilled and compacted to restore the original contour of the ground. The fill <br />material shall be backfilled and compacted in accordance with Section 120 of these <br />specifications. <br />H. No additional payment will be made, nor will additional work, or change orders be <br />authorized for work needed to remove, relocate, protect, or otherwise account for in <br />the construction of the work depicted in the plans, for any feature, or item that would <br />be apparent from a careful inspection of the site and review of the plans, even though <br />such feature or item is not specifically called out in the plans. It is therefore essential <br />the contractor make such inspection and review. <br />I. The unit price bid for this item shall include the cost of all labor, tools, and equipment <br />necessary to excavate, remove, and dispose of those items as directed by the <br />Engineer and where designated on the Drawings. The cost of restoration and backfill <br />and compaction for the specific area of removal shall also be included under this item. <br />J. The unit price bid for this item shall include the cost of all labor, tools, and equipment <br />necessary to excavate, remove and dispose of the existing bridge. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item 110 - Mailbox Relocation — Per Each <br />Bid Item 110-1-1 - Clearing and Grubbing - Lump Sum <br />SECTION -120 EXCAVATION AND EMBANKMENT <br />A. Earthwork, including earthwork for drives outside the right-of-way limits, shall be <br />paid for as embankment. Cost shall include all work specified in this section and <br />Section 120 of the Standard Specifications. Such price and payment shall <br />specifically include all cost of any roadway, lateral ditch or canal, and final dressing <br />operations. <br />01025-24 Technical Specifications <br />F•\Public Works\ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.