Laserfiche WebLink
SECTION - 285 CEMENTED COQUINA SHELL BASE / COMPACTED ASPHALT <br />MILLINGS <br />A. Sub Article 285-4 is modified by the addition of the following: <br />Base material, thickness and requirements are described in the construction plans. <br />Only one type of alternate base material shall be used. No additional payment will be <br />made for base thickness in excess of the specified thickness <br />B. Payment shall be made under: <br />Bid Item No. 285-706 — Cemented Coquina Shell Base Group 6 (8") Two Lifts - <br />Per Square Yard <br />Bid Item No. 285-706A — Compacted Asphalt Millings ( 8") Two Lifts — Per Square <br />Yard <br />SECTION — 334 SUPERPAVE ASPHALTIC PAVEMENT <br />The work specified in this item shall conform to Section 334 of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge <br />Construction (2013). <br />Sub article 334-8.1 through 334-8.3 — Basis of Payment shall be deleted in its <br />entirety. <br />Sub article 334-8.4 — Payment shall be amended as follows: <br />Bid Item No. 334-1-113 — Superpave Asphaltic Concrete -1" SP 9.5 — Per Square <br />Yard <br />Bid Item No. 334-1-113A — Superpave Asphaltic Concrete —1 1/2" SP 12.5 — Per <br />Square Yard <br />SECTION — 339 SUPERPAVE ASPHALTIC PAVEMENT <br />The work specified in this item shall conform to Section 339 of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge <br />Construction (2013). <br />Payment shall be made under: <br />Item No. 339-1 — Miscellaneous Asphalt (2" thick) - Per Ton <br />01025-26 Technical Specifications <br />F\Public Works\ENGINEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge\Admin\bid documentsWlaster <br />Contract Documents\Technical Specifications.doc <br />