Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and bick.e.r5on F1ori ,j I nc , <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed improvements will include the replacement of the le Street SW Bridge <br />over the I.R.F.W.C.D. Lateral B Canal at 58"' Avenue, the paving of 800 linear feet oft?' <br />Street SW and the placement of recycled asphalt pavement (asphalt millings) for <br />approximately % mile of 58f'' Ave between 13th Street SW and e Street SW (Oslo Road). <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 13th Street S.W. at 58th Avenue Bridge <br />County Project Number: 0530B <br />Bid Number: 2014046 <br />Project Address: le Street S.W. at 58"' Avenue, Indian River County, FL <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 04-07.doc <br />00520 - 2 <br />F:IPublic Works1ENGINEERING DIVISION PROJECTS10530B 13th Street SW at 58th Ave BridgeWdminlbid documents1Master Contract Documents100520 - Agreement <br />(Public Works) REV 04-07.doc <br />