My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project No.:. 05308 <br />Project Description: 13th Street S.W. at 58th Avenue Bridge <br />OWNER's Bid No. 2014046 <br />CONTRACT FOR: 13th Street S.W. at 58th Avenue Bridge <br />(Insert Name of Contract as it appears in the Bid Documents) <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To. <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 days of <br />the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07.doc <br />00630 - 1 <br />F \Public Works\ ENGINEERING DIVISION PROJECTS105308 13th Street SW at 58th Ave Bridge Admin\bid documents\ Master Contract Documents\00630 - Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.