My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.08 Permits 22 <br />6.09 Laws and Regulations 22 <br />6.10 Taxes 22 <br />6.11 Use of Site and Other Areas 22 <br />6.13 Safety and Protection 23 <br />6.14 Safety Representative 24 <br />6.15 Hazard Communication Programs 23 <br />6.16 Emergencies 24 <br />6.17 Shop Drawings and Samples 24 <br />6.18 Continuing the Work 25 <br />6.19 CONTRACTOR's General Warranty and Guarantee 25 <br />6.20 Indemnification 26 <br />ARTICLE 7 - OTHER WORK 26 <br />7.01 Related Work at Site ... 26 <br />7.02 Coordination 27 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES 27 <br />8.01 Communications to Contractor 27 <br />8.02 Replacement of ENGINEER 27 <br />8.03 Furnish Data 27 <br />8.04 Pay Promptly When Due 27 <br />8.05 Lands and Easements; Reports and Tests 27 <br />8.06 Insurance .28 <br />8.07 Change Orders 28 <br />8.08 Inspections, Tests, and Approvals 28 <br />8.09 Limitations on OWNER's Responsibilities 28 <br />8.10 Undisclosed Hazardous Environmental Condition 28 <br />8 11 Evidence of Financial Arrangements .28 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION.. 28 <br />9.01 OWNER'S Representative 28 <br />9.02 Visits to Site . . 28 <br />9.03 Project Representative 28 <br />9.04 Clarifications and Interpretations. 29 <br />9.05 Authorized Variations in Work 29 <br />9.06 Rejecting Defective Work .. 29 <br />9.07 Shop Drawings, Change Orders and Payments 29 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities 30 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 30 <br />10.01 Authorized Changes in the Work 30 <br />10.02 Unauthorized Changes in the Work 30 <br />10.03 Execution of Change Orders 30 <br />10 04 Notification to Surety 31 <br />10.05 Claims and Disputes 31 <br />ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK 32 <br />11.01 Cost of the Work 32 <br />11.02 Cash Allowances 34 <br />11.03 Unit Price Work 34 <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 34 <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 3 <br />F \Public Works\ENGINEERING DIVISION PROJECTS \053013 13th Street SW at 58th Ave Bridge \ Admin \bid documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.