My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
precautions and programs incident thereto; <br />and <br />d. CONTRACTOR shall also have <br />reviewed and coordinated each Shop <br />Drawing or Sample with other Shop <br />Drawings and Samples and with the <br />requirements of the Work and the Contract <br />Documents. <br />2. Each submittal shall bear a stamp or <br />specific written indication that CONTRACTOR <br />has satisfied CONTRACTOR's obligations <br />under the Contract Documents with respect to <br />CONTRACTOR's review and approval of that <br />submittal. <br />3. At the time of each submittal, CON- <br />TRACTOR shall give ENGINEER specific <br />written notice of such variations, if any, that the <br />Shop Drawing or Sample submitted may have <br />from the requirements of the Contract <br />Documents, such notice to be in a written com- <br />munication separate from the submittal; and, in <br />addition, shall cause a specific notation to be <br />made on each Shop Drawing and Sample sub- <br />mitted to ENGINEER for review and approval of <br />each such variation. <br />E. ENGINEER's Review <br />1 ENGINEER will timely review and <br />approve Shop Drawings and Samples in <br />accordance with the schedule of Shop <br />Drawings and Sample submittals acceptable to <br />ENGINEER. ENGINEER's review and <br />approval will be only to determine if the items <br />covered by the submittals will, after installation <br />or incorporation in the Work, conform to the <br />information given in the Contract Documents <br />and be compatible with the design concept of <br />the completed Project as a functioning whole as <br />indicated by the Contract Documents. <br />2. ENGINEER's review and approval <br />will not extend to means, methods, techniques, <br />sequences, or procedures of construction <br />(except where a particular means, method, <br />technique, sequence, or procedure of con- <br />struction is specifically and expressly called for <br />by the Contract Documents) or to safety <br />precautions or programs incident thereto. The <br />review and approval of a separate item as such <br />will not indicate approval of the assembly in <br />which the item functions. <br />3. ENGINEER's review and approval of <br />Shop Drawings or Samples shall not relieve <br />CONTRACTOR from responsibility for any <br />variation from the requirements of the Contract <br />Documents unless CONTRACTOR has in <br />writing called ENGINEER's attention to each <br />such variation at the time of each submittal as <br />required by paragraph 6.17.D.3 and ENGI- <br />NEER has given written approval of each such <br />variation by specific written notation thereof <br />incorporated in or accompanying the Shop <br />Drawing or Sample approval; nor will any <br />approval by ENGINEER relieve CON- <br />TRACTOR from responsibility for complying <br />with the requirements of paragraph 6.17.D.1. <br />F. Resubmittal Procedures <br />1. CONTRACTOR shall make correc- <br />tions required by ENGINEER and shall return <br />the required number of corrected copies of <br />Shop Drawings and submit as required new <br />Samples for review and approval. CON- <br />TRACTOR shall direct specific attention in <br />writing to revisions other than the corrections <br />called for by ENGINEER on previous <br />submittals. <br />6.18 Continuing the Work <br />A. CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule during all disputes or <br />disagreements with OWNER. No Work shall be <br />delayed or postponed pending resolution of any <br />disputes or disagreements, except as permitted by <br />paragraph 15.04 or as OWNER and CONTRACTOR <br />may otherwise agree in writing. <br />6.19 CONTRACTOR's General Warranty and <br />Guarantee <br />A. CONTRACTOR warrants and guarantees to <br />OWNER, ENGINEER, and ENGINEER's Consultants <br />that all Work will be in accordance with the Contract <br />Documents and will not be defective. <br />CONTRACTOR's warranty and guarantee hereunder <br />excludes defects or damage caused by: <br />1. abuse, modification, or improper <br />maintenance or operation by persons other <br />than CONTRACTOR, Subcontractors, <br />Suppliers, or any other individual or entity for <br />whom CONTRACTOR is responsible; or <br />2. normal wear and tear under normal <br />usage. <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 25 <br />F \Public Works\ENGINEERING DIVISION PROJECTS \053013 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.