My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-122A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-122A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:28:12 PM
Creation date
1/10/2017 10:00:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Correspondence
Approved Date
09/09/2014
Control Number
2014-122A
Agenda Item Number
8.U.
Entity Name
Dickerson Florida Inc.
Subject
Contract and Specifications
13th St. SW at 58th Ave. Bridge
Area
13th St. SW
Project Number
0530B
Bid Number
2014046
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.01 and 4.05. Paragraph 4.02 refers to OWNER's <br />identifying and making available to CONTRACTOR <br />copies of reports of explorations and tests of <br />subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the Site that <br />have been utilized by ENGINEER in preparing the <br />Contract Documents. <br />8.06 Insurance <br />A. OWNER's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance are set forth in Article 5. <br />8.07 Change Orders <br />A. OWNER is obligated to execute Change <br />Orders as indicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. OWNER's responsibility in respect to certain <br />inspections, tests, and approvals is set forth in <br />paragraph 13.03.B. <br />8.09 Limitations on OWNER's Responsibilities <br />A. The OWNER shall not supervise, direct, or <br />have control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, se- <br />quences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any <br />failure of CONTRACTOR to comply with Laws and <br />Regulations applicable to the performance of the <br />Work. OWNER will not be responsible for <br />CONTRACTOR's failure to perform the Work in <br />accordance with the Contract Documents. <br />8.10 Undisclosed Hazardous Environmental <br />Condition <br />A. OWNER's responsibility in respect to an <br />undisclosed Hazardous Environmental Condition is <br />set forth in paragraph 4.06. <br />8.11 Evidence of Financial Arrangements <br />A. If and to the extent OWNER has agreed to <br />furnish CONTRACTOR reasonable evidence that <br />financial arrangements have been made to satisfy <br />OWNER's obligations under the Contract Documents, <br />OWNER's responsibility in respect thereof will be as <br />set forth in the Supplementary Conditions. <br />ARTICLE 9 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br />9.01 OWNER'S Representative <br />A. ENGINEER will be OWNER's representative <br />during the construction period. The duties and <br />responsibilities and the limitations of authority of <br />ENGINEER as OWNER's representative during <br />construction are set forth in the Contract Documents <br />and will not be changed without written consent of <br />OWNER and ENGINEER. <br />9.02 Visits to Site <br />A. ENGINEER will make visits to the Site at <br />intervals appropriate to the various stages of construc- <br />tion as ENGINEER deems necessary in order to <br />observe as an experienced and qualified design <br />professional the progress that has been made and the <br />quality of the various aspects of CONTRACTOR's <br />executed Work. Based on information obtained <br />during such visits and observations, ENGINEER, for <br />the benefit of OWNER, will determine, in general, if <br />the Work is proceeding in accordance with the Con- <br />tract Documents. ENGINEER will not be required to <br />make exhaustive or continuous inspections on the <br />Site to check the quality or quantity of the Work. <br />ENGINEER's efforts will be directed toward providing <br />for OWNER a greater degree of confidence that the <br />completed Work will conform generally to the Contract <br />Documents. On the basis of such visits and <br />observations, ENGINEER will keep OWNER informed <br />of the progress of the Work and will endeavor to guard <br />OWNER against defective Work. <br />B. ENGINEER's visits and observations are <br />subject to all the limitations on ENGINEER's authority <br />and responsibility set forth in paragraph 9.10, and <br />particularly, but without limitation, during or as a result <br />of ENGINEER's visits or observations of <br />CONTRACTOR's Work ENGINEER will not <br />supervise, direct, control, or have authority over or be <br />responsible for CONTRACTOR's means, methods, <br />techniques, sequences, or procedures of construction, <br />or the safety precautions and programs incident <br />thereto, or for any failure of CONTRACTOR to comply <br />with Laws and Regulations applicable to the <br />performance of the Work. <br />9.03 Project Representative <br />A. If OWNER and ENGINEER agree, ENGI- <br />NEER will furnish a Resident Project Representative <br />to assist ENGINEER in providing more extensive <br />observation of the Work. The responsibilities and <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 28 <br />F\Public Works\ENGINEERING DIVISION PROJECTS \05306 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.