CONTRACTOR of such rights or remedies as either <br />may otherwise have under the Contract Documents or <br />by Laws or Regulations in respect of any such Claim, <br />dispute, or other matter. <br />9.10 Limitations on ENGINEER's Authority and <br />Responsibilities <br />A. Neither ENGINEER's authority or respon- <br />sibility under this Article 9 or under any other provision <br />of the Contract Documents nor any decision made by <br />ENGINEER in good faith either to exercise or not <br />exercise such authority or responsibility or the <br />undertaking, exercise, or performance of any authority <br />or responsibility by ENGINEER shall create, impose, <br />or give rise to any duty in contract, tort, or otherwise <br />owed by ENGINEER to CONTRACTOR, any Subcon- <br />tractor, any Supplier, any other individual or entity, or <br />to any surety for or employee or agent of any of them. <br />B. ENGINEER will not supervise, direct, control, <br />or have authority over or be responsible for <br />CONTRACTOR's means, methods, techniques, se- <br />quences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any <br />failure of CONTRACTOR to comply with Laws and <br />Regulations applicable to the performance of the <br />Work. ENGINEER will not be responsible for <br />CONTRACTOR's failure to perform the Work in <br />accordance with the Contract Documents. <br />C ENGINEER will not be responsible for the <br />acts or omissions of CONTRACTOR or of any <br />Subcontractor, any Supplier, or of any other individual <br />or entity performing any of the Work. <br />D. ENGINEER's review of the final Application <br />for Payment and accompanying documentation and all <br />maintenance and operating instructions, schedules, <br />guarantees, Bonds, certificates of inspection, tests <br />and approvals, and other documentation required to <br />be delivered by paragraph 14.07.A will only be to <br />determine generally that their content complies with <br />the requirements of, and in the case of certificates of <br />inspections, tests, and approvals that the results <br />certified indicate compliance with, the Contract <br />Documents. <br />E. The limitations upon authority and responsibil- <br />ity set forth in this paragraph 9.10 shall also apply to <br />ENGINEER's Consultants, Resident Project Repre- <br />sentative, and assistants. <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />10.01 Authorized Changes in the Work <br />A. Without invalidating the Agreement and <br />without notice to any surety, OWNER may, at any time <br />or from time to time, order additions, deletions, or <br />revisions in the Work by a Written Amendment, a <br />Change Order, or a Work Change Directive. Upon <br />receipt of any such document, CONTRACTOR shall <br />promptly proceed with the Work involved which will be <br />performed under the applicable conditions of the <br />Contract Documents (except as otherwise specifically <br />provided). <br />B. If OWNER and CONTRACTOR are unable to <br />agree on entitlement to, or on the amount or extent, if <br />any, of an adjustment in the Contract Price or Contract <br />Times, or both, that should be allowed as a result of a <br />Work Change Directive, a Claim may be made <br />therefor as provided in paragraph 10.05. <br />10.02 Unauthorized Changes in the Work <br />A. CONTRACTOR shall not be entitled to an <br />increase in the Contract Price or an extension of the <br />Contract Times with respect to any work performed <br />that is not required by the Contract Documents as <br />amended, modified, or supplemented as provided in <br />paragraph 3.04, except in the case of an emergency <br />as provided in paragraph 6.16 or in the case of <br />uncovering Work as provided in paragraph 13.04.B. <br />10.03 Execution of Change Orders <br />A. OWNER and CONTRACTOR shall execute <br />appropriate Change Orders recommended by ENGI- <br />NEER (or Written Amendments) covering: <br />1. changes in the Work which are: (i) <br />ordered by OWNER pursuant to paragraph <br />10.01.A, (ii) required because of acceptance of <br />defective Work under paragraph 13.08.A or <br />OWNER's correction of defective Work under <br />paragraph 13.09, or (iii) agreed to by the <br />parties; <br />2. changes in the Contract Price or <br />Contract Times which are agreed to by the <br />parties, including any undisputed sum or <br />amount of time for Work actually performed in <br />accordance with a Work Change Directive, and <br />3. changes in the Contract Price or <br />Contract Times which embody the substance of <br />any written decision rendered by ENGINEER <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 30 <br />F \Public Works\ENGINEERING DIVISION PROJECTS \05308 13th Street SW at 58th Ave Bridge\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />