My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-125
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 2:52:44 PM
Creation date
1/10/2017 11:07:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/09/2014
Control Number
2014-125
Agenda Item Number
8.Z.
Entity Name
Indian River Memorial Hospital
Subject
Developer's Agreement
Cancer Center Expansion project right turn lane
Area
37th St.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />CONSTRUCTION COST ESTIMATE <br />INDIAN RIVER MEDICAL CENTER - CANCER CENTER EXPANSION <br />OFF-SITE TURN LANE & FAIR SHARE SIGNALIZATION UPGRADE <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL <br />IRMC Right Turn Lane on 37th Street at 10th Court <br />Mobilization <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />Maintenance of traffic <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />Staked silt fence <br />400 <br />LF <br />$2.00 <br />$800.00 <br />Floating turbidity barrier <br />1 <br />EA <br />$300.00 <br />$300.00 <br />Wellpointing / dewatering <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />Strip ditch sides, clean out ditch bottom <br />1 <br />LS <br />$1,500.00 <br />$1,500.00 <br />Excavation (decel lane) <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />12" Stabilized subgrade <br />836 <br />SY <br />$5.00 <br />$4,180.00 <br />8" Crushed concrete base <br />738 <br />SY <br />$11.60 <br />$8,560.80 <br />2" SP -12.5 asphalt & prime <br />733 <br />SY <br />$14.00 <br />$10,262.00 <br />Thermoplastic striping & signs <br />1 <br />LS <br />$1,800.00 <br />$1,800.00 <br />Survey / layout / as-builts <br />1 <br />LS <br />$3,500.00 <br />$3,500.00 <br />$42,402.80 <br />IRMC Signalization Upgrade on 37th Street at 10th Court (Fair Share 25%) <br />Total Estimated Construction Cost for Signal Upgrade to Mast Arms <br />$250,000.00 <br />IRMC Cancer Center Expansion Fair Share (%) <br />25% <br />IRMC Cancer Center Expansion Fair Share of Construction Cost <br />$62,500.00 <br />Total IRMC Cancer Center Expansion Contribution <br />$104,902.80 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.