Laserfiche WebLink
CHANGE ORDER NO. 4 <br />q)4 /1.4 <br />8.AA <br />cO /L - i;V <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />9/9/2014 <br />9/9/2014 <br />OWNER: INDIAN RIVER COUNTY <br />CONTRACTOR: CLOSE CONSTRUCTION, LLC <br />PROJECT: PC South Algal Nutrient Removal Facility,_ <br />OWNER'S PROJECT NUMBER: 949 <br />ENGINEER: INDIAN RIVER COUNTY <br />You are directed to make the following changes in the Contract Documents: <br />Item <br />Description <br />Increase/Decrease <br />in Contract Price <br />Increase/Decrease <br />in Contract Time <br />(Calendar Days) <br />1.0 <br />Delete transportation charge for sheet piling used <br />at the South Relief Canal pump station site <br />($750.00) <br />0.0 <br />2.0 <br />Deduct 5' section of precast inlet throat for South <br />Relief Canal Pump Station <br />($3,690.39) <br />0.0 <br />3.0 <br />Furnish and install a 12" PVC flange and an 18" long <br />PVC spool piece at the end of the plug valve at the <br />north face of the Distribution Box. <br />" <br />$561.07 <br />0.0 <br />• 4.0 <br />Contract deduct for failed density tests per Section <br />01410, paragraph 1.1.A. (GFA Invoice #183588) <br />($720.00) <br />0.0 <br />5.0 <br />Revise Pump Station No. 1 electrical design <br />(breaker size and conduit size) <br />$19,162.00 <br />0.0 <br />6.0 <br />Furnish and install all materials etc. and construct <br />up to three 6" diameter wells for the recycle water <br />system and connect them in a manifold system and <br />connect to the existing Gorrman-Rupp pump as <br />described in letters contained in Attachment 10 to <br />Keith McCully from American Drilling Services, Inc. <br />$31,514.11 <br />0.0 <br />7.0 <br />Furnish materials for and construct a 3" PVC gravel <br />pack well near the effluent structure <br />$3,300.00 <br />0.0 <br />8.0 <br />Permit fees per Florida Statutes 218.80, Public Bid <br />Disclosure Act <br />$1,637.86 <br />0.0 <br />9.0 <br />Insurance adjustment due to increase in contract <br />price <br />$510.15 <br />0.0 <br />10.0 <br />Bond increase due to increase in contract price <br />($11.11 per one thousand) <br />$566.61 <br />0.0 <br />TOTALS <br />$52,091.41 <br />0.0 <br />