My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-126
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:43:25 PM
Creation date
1/10/2017 1:23:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/09/2014
Control Number
2014-126
Agenda Item Number
8.A.A.
Entity Name
Close Construction
Subject
Osprey Marsh Stormwater Park
Change Order No.4
PC South Algal Nutrient Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO. 4 <br />q)4 /1.4 <br />8.AA <br />cO /L - i;V <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />9/9/2014 <br />9/9/2014 <br />OWNER: INDIAN RIVER COUNTY <br />CONTRACTOR: CLOSE CONSTRUCTION, LLC <br />PROJECT: PC South Algal Nutrient Removal Facility,_ <br />OWNER'S PROJECT NUMBER: 949 <br />ENGINEER: INDIAN RIVER COUNTY <br />You are directed to make the following changes in the Contract Documents: <br />Item <br />Description <br />Increase/Decrease <br />in Contract Price <br />Increase/Decrease <br />in Contract Time <br />(Calendar Days) <br />1.0 <br />Delete transportation charge for sheet piling used <br />at the South Relief Canal pump station site <br />($750.00) <br />0.0 <br />2.0 <br />Deduct 5' section of precast inlet throat for South <br />Relief Canal Pump Station <br />($3,690.39) <br />0.0 <br />3.0 <br />Furnish and install a 12" PVC flange and an 18" long <br />PVC spool piece at the end of the plug valve at the <br />north face of the Distribution Box. <br />" <br />$561.07 <br />0.0 <br />• 4.0 <br />Contract deduct for failed density tests per Section <br />01410, paragraph 1.1.A. (GFA Invoice #183588) <br />($720.00) <br />0.0 <br />5.0 <br />Revise Pump Station No. 1 electrical design <br />(breaker size and conduit size) <br />$19,162.00 <br />0.0 <br />6.0 <br />Furnish and install all materials etc. and construct <br />up to three 6" diameter wells for the recycle water <br />system and connect them in a manifold system and <br />connect to the existing Gorrman-Rupp pump as <br />described in letters contained in Attachment 10 to <br />Keith McCully from American Drilling Services, Inc. <br />$31,514.11 <br />0.0 <br />7.0 <br />Furnish materials for and construct a 3" PVC gravel <br />pack well near the effluent structure <br />$3,300.00 <br />0.0 <br />8.0 <br />Permit fees per Florida Statutes 218.80, Public Bid <br />Disclosure Act <br />$1,637.86 <br />0.0 <br />9.0 <br />Insurance adjustment due to increase in contract <br />price <br />$510.15 <br />0.0 <br />10.0 <br />Bond increase due to increase in contract price <br />($11.11 per one thousand) <br />$566.61 <br />0.0 <br />TOTALS <br />$52,091.41 <br />0.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.